Laserfiche WebLink
EDLUND • DRITENBAS • SINKLEY <br />ARCHITECTS AND ASSOCIATES, P.A. <br />65 Royal Palrn Pointe, Ste D <br />Vero Beach, FL 32960 <br />Ph: (772) 569-4320 Fac (772) 569-9208 <br />;RCM Station 4#1 <br />Programming Statement / Scope of Work <br />16 October 2014 <br />1) Remove all perimeter berms, foundations and infrastructure concealed within elevation of berms. <br />2) Provide grading of ground for slope to two existing stormwater management areas. Sod as required. <br />3) All exposed exterior walls, pressure clean old parge coating, lath full wail and provide 3" stucco and <br />Y" ground control joints at 8'-0" o/c Provide a vinyl 1 -bead at bottom of new applied stucco. <br />4) Repair flat roof and north and south vertical parapets. Provide new flashing. <br />5) Spray Icynene Insulation to underside of existing plywood roof deck at N & S bays. <br />6) Remove and replace ductwork at north and south bays. <br />7) Remove all S.A.T. ceilings and fiberglass batt insulation sitting on top of S.A.T. Replace S.A.T. and T - <br />grid. <br />8) Remodel kitchen by enlarging to north or west. <br />9) Alt exterior aluminum soffits to be removed. Provide hi -rib lath and stucco at openings. <br />10) Insulate exterior block walls with Corefihl 500 Insulation prior to applying new full height stucco <br />overcoat. <br />11) Remove all interior gypsum walls that show evidence of water or moisture damage. Remove P.T. 1x2 <br />and replace with new Bora' treated P.T. 1x2 @ 16" o/c. <br />12) Replace particle board parapet walls with structural 5/8" cdx ply. Dry -In and apply %" stucco over <br />new galvanized self -furring wire lath. <br />13) Replace or repair perimeter gutters and downspouts using .040 commercial grade aluminum. <br />14) Provide new commercial exhaust hood In kitchen, complete with ansul extinguishing system. <br />15) Provide 3 new lockable pantry's in kitchen. <br />16) All tops in kitchen to be roil front protected stainless steel. <br />