My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-206
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 12:20:07 PM
Creation date
1/20/2017 1:48:53 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17) By way of FBC 2010 code for existing buildings, the scope of work proposed places this project under <br />"Alteration -Level 3" per Section 405. Work area exceeds 50 percent of the aggregate area of the <br />building. Level -3 alterations must comply with the provisions of Chapter 6 and 7, as well as Chapter <br />8. Section 804.1 calls for Automatic Sprinkler Systems in all areas being "worked" i.e. renovated in <br />accordance with FBC 2010. Because Fire Stations are considered Group R-2 occupancies, Section <br />903.2.8 FBC calls for automatic sprinkler systems thru-out all buildings with a Group -R fire area, as <br />refined by Section 310.1 Residential R-2. <br />18) Renovate Men's and Women's toliet/shower rooms to meet ADA or provide one standalone unisex <br />toilet/shower room that complies with FBC accessibility standards. <br />19) Upgrade fire alarm, pull stations, horns, strobes, and F.A.C.P. along with a new enunciator panel. <br />20) Provide Fire Fighter Safety Building marking emblem per F.S. 633.027 and NFPA 1, Annex Q. <br />21) Relocate 2 exterior A/C units sitting on concrete pads to new, lower elevations on concrete pads. <br />Refrigerant lines, thermostat lines and electrical lines from wall mounted disconnects will have to be <br />modified. <br />22) Provide new hi/low electric water coolers. <br />23) Note, per FBC and ADA, up to 20% of cost of renovations must be spent bringing this facility into <br />compliance with barrier removal and accessibility. <br />24) All door hardware must be replaced with lever set units. <br />25) Provide new 3 compartment sink and disposal in kitchen. <br />26) Repaint interiors and exterior of building. <br />27) Repair sloping fiberglass roof areas where leaks are evident. Shingles appear to have remaining <br />useful life. <br />28) Consider lighting upgrades in offices and kitchen areas. <br />29) Are the parking and circulation areas for re -cuing the trucks bright enough? Are additional lights <br />required in the parking lot? <br />30) Can the removed fill dirt at the berms be transported directly west to the COVB soil storage area, in <br />lieu of trucking offsite? <br />31) Can the station crew remain in the facility during renovations, and reconstruction? <br />32) We need to revisit Life Safety for safe existing from all areas of the north and south wings, including <br />exit lights and emergency overhead or wall pack lighting. <br />c:\Mary\100114VB\scope.doC: <br />
The URL can be used to link to this page
Your browser does not support the video tag.