Laserfiche WebLink
STATE OF FLORIDA, DEPARTMENT OF MANAGEMENT SERVICES AE FEE CA... Page 1 of ' <br />Fee Guide Calculator <br />For Architectural and Engineering Services <br />State or Florida. Department of rdanagement Serv,crs <br />ersion Posted: March 2012 <br />Project Nam: <br />tRFD EMS Station #1 Renovation <br />CONSTRUCTION <br />COST FOR <br />BUILDING (Sitewort <br />Not Included) <br />COMPLEXITY GROUP - PERCENTAGE <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />9.62% <br />8.80% <br />8.97% <br />7.99% <br />7.18% <br />6.38% <br />10.09% <br />S 680,000 <br />CALCULATED FEE <br />$65,388 <br />$59,822 <br />$60,996 <br />$54,329 <br />$48,840 <br />$43,415 <br />$68,591 <br />Instructions: Fit in probable construction cost at left and push enter key. <br />GROUP DEFINITIONS: <br />"A" - CONSIDERABLY MORE THAN AVERAGE COMPLF,XITY: Complex Laboratories, Medical Hospitals <br />"B" - MORE THAN AVERAGE COMPLEXITY: Average laboratories, Mental Hospitals, Simple Medical Hospitals, Clinics, Court <br />Houses, Theatres, Complex University Buildings. Special Purpose Classrooms Laboratory Classrooms, Libraries, Auditoriums, <br />Museums, AirTerminals, Food Service Facilities, Specialized Detention Areas, Detention Treatment Areas, Residences, Emergency <br />Management Centers <br />"C" - REPAIRS AND RENOVATIONS: Miscellaneous Repairs and Renovations, Alterations to Office Space or Dormitory Space. <br />Fite Code Corrective Work <br />"D" - AVERAGE COMPLEXITY: General Office Space, General Teaching Space, Gymnasiums, General Detention Living Facilities <br />Factory Buildings <br />"E" - LESS THAN AVERAGE COMPLEXITY: Apartment Buildings, Dormitory Buildings, Service Garages, Stadiums, Repetitive <br />Design Facilities, Office Buildings With Undefined Interior Space (open for later partitioning), Specialized Parking Structures <br />"F"- CONSIDERABLY LESS THAN AVERAGE COMPLEXITY: Warehouses, Parking Garages, Storage Facilities <br />"G" - BUILDING ENGINEERING SERVICES: Mechanical, Electrical and Structural not exceeding $1,000,000 in construction (Not <br />incbuding Site Civil) <br />ADDITIONAL SERVICES & EXPENSES: <br />The following services are considered Additional to Basic Services and are not Included within the <br />basic fee represented by the fee guides: <br />-Feasibility Studies/ Analysis <br />-Facility Programming <br />-Master Planning <br />-Soils Investigations/Reports <br />-Surveys Topographie/Botmdary <br />Vegetation/Improvements/Utilities <br />-Measured Drawings ofExistingFacilities <br />-Existing Facilities Analysis <br />-Toxic Substance Mitigation Surveys and Consultation <br />-Site Environmental Assessments <br />-Site DRI, PUD, Site Plan Review and/or Zoning Modifications <br />Traffic Analysis and Traffic Signal Warrant Studies <br />-Civil Engineering Design including <br />Paving/Grading/Utilities <br />/Drninage/Stonnwater Management/Environmental & All Site <br />Permitting <br />-Existing Site Utility infrastructure Improvements <br />-Site Lighting Design <br />-Landscape Architectural & Irrigation Design <br />-Specialty Consultants <br />Voice/Data Communications; ElectroniclAudio <br />Visual; Food Service Equipment; Hazardous <br />Material; Hospital/Laboratory; interior Design; <br />Indoor Air Quality; Quality Control; <br />Theater/Acoustical; Security <br />-Life Cycle Cost (ROI) and/or Federal DOE Energy Analysis <br />• As defined in the Division of Real Estate Development and Manan <br />-LEED Consultation <br />-Graphic end Signage Design <br />-Special Code Reviews including ACHA <br />-Detailed Cost Estimates - <br />-Documents Prepared For. <br />-Alternate Bids Exceeding Contract Scope <br />-Eseessive Change Orders <br />-Multiple Construction Contracts <br />-Record Dominions/As Buiits <br />-Prolonged Construction Contract Administration Services <br />-Stntcturallhreshold inspections <br />-Project Representation During <br />Construction Beyond Bi -Monthly Administration <br />-Additional Construction Contract <br />Administration Services for Multiple Contracts <br />-Building Commissioning and Training Services <br />-Post Occupancy huts/ Evaluations <br />-Renderings/ Models <br />- Substantive Changes to Scope, Size or Complexity <br />-Owner Requested Changes to Approved Documents <br />-Reimbursable Expenses* <br />Including, but not limited to, reproduction/ printing <br />costs, <br />travel expenses and special mail service expenses <br />ement Form of Agreement Between Owner and Architect - <br />Engineer. <br />LI .. ra .__rr.* so a r•rs--n..: i -r~_: _ 1 <br />......u.... . <br />