STATE OF FLORIDA, DEPARTMENT OF MANAGEMENT SERVICES AE FEE CA... Page 1 of '
<br />Fee Guide Calculator
<br />For Architectural and Engineering Services
<br />State or Florida. Department of rdanagement Serv,crs
<br />ersion Posted: March 2012
<br />Project Nam:
<br />tRFD EMS Station #1 Renovation
<br />CONSTRUCTION
<br />COST FOR
<br />BUILDING (Sitewort
<br />Not Included)
<br />COMPLEXITY GROUP - PERCENTAGE
<br />A
<br />B
<br />C
<br />D
<br />E
<br />F
<br />G
<br />9.62%
<br />8.80%
<br />8.97%
<br />7.99%
<br />7.18%
<br />6.38%
<br />10.09%
<br />S 680,000
<br />CALCULATED FEE
<br />$65,388
<br />$59,822
<br />$60,996
<br />$54,329
<br />$48,840
<br />$43,415
<br />$68,591
<br />Instructions: Fit in probable construction cost at left and push enter key.
<br />GROUP DEFINITIONS:
<br />"A" - CONSIDERABLY MORE THAN AVERAGE COMPLF,XITY: Complex Laboratories, Medical Hospitals
<br />"B" - MORE THAN AVERAGE COMPLEXITY: Average laboratories, Mental Hospitals, Simple Medical Hospitals, Clinics, Court
<br />Houses, Theatres, Complex University Buildings. Special Purpose Classrooms Laboratory Classrooms, Libraries, Auditoriums,
<br />Museums, AirTerminals, Food Service Facilities, Specialized Detention Areas, Detention Treatment Areas, Residences, Emergency
<br />Management Centers
<br />"C" - REPAIRS AND RENOVATIONS: Miscellaneous Repairs and Renovations, Alterations to Office Space or Dormitory Space.
<br />Fite Code Corrective Work
<br />"D" - AVERAGE COMPLEXITY: General Office Space, General Teaching Space, Gymnasiums, General Detention Living Facilities
<br />Factory Buildings
<br />"E" - LESS THAN AVERAGE COMPLEXITY: Apartment Buildings, Dormitory Buildings, Service Garages, Stadiums, Repetitive
<br />Design Facilities, Office Buildings With Undefined Interior Space (open for later partitioning), Specialized Parking Structures
<br />"F"- CONSIDERABLY LESS THAN AVERAGE COMPLEXITY: Warehouses, Parking Garages, Storage Facilities
<br />"G" - BUILDING ENGINEERING SERVICES: Mechanical, Electrical and Structural not exceeding $1,000,000 in construction (Not
<br />incbuding Site Civil)
<br />ADDITIONAL SERVICES & EXPENSES:
<br />The following services are considered Additional to Basic Services and are not Included within the
<br />basic fee represented by the fee guides:
<br />-Feasibility Studies/ Analysis
<br />-Facility Programming
<br />-Master Planning
<br />-Soils Investigations/Reports
<br />-Surveys Topographie/Botmdary
<br />Vegetation/Improvements/Utilities
<br />-Measured Drawings ofExistingFacilities
<br />-Existing Facilities Analysis
<br />-Toxic Substance Mitigation Surveys and Consultation
<br />-Site Environmental Assessments
<br />-Site DRI, PUD, Site Plan Review and/or Zoning Modifications
<br />Traffic Analysis and Traffic Signal Warrant Studies
<br />-Civil Engineering Design including
<br />Paving/Grading/Utilities
<br />/Drninage/Stonnwater Management/Environmental & All Site
<br />Permitting
<br />-Existing Site Utility infrastructure Improvements
<br />-Site Lighting Design
<br />-Landscape Architectural & Irrigation Design
<br />-Specialty Consultants
<br />Voice/Data Communications; ElectroniclAudio
<br />Visual; Food Service Equipment; Hazardous
<br />Material; Hospital/Laboratory; interior Design;
<br />Indoor Air Quality; Quality Control;
<br />Theater/Acoustical; Security
<br />-Life Cycle Cost (ROI) and/or Federal DOE Energy Analysis
<br />• As defined in the Division of Real Estate Development and Manan
<br />-LEED Consultation
<br />-Graphic end Signage Design
<br />-Special Code Reviews including ACHA
<br />-Detailed Cost Estimates -
<br />-Documents Prepared For.
<br />-Alternate Bids Exceeding Contract Scope
<br />-Eseessive Change Orders
<br />-Multiple Construction Contracts
<br />-Record Dominions/As Buiits
<br />-Prolonged Construction Contract Administration Services
<br />-Stntcturallhreshold inspections
<br />-Project Representation During
<br />Construction Beyond Bi -Monthly Administration
<br />-Additional Construction Contract
<br />Administration Services for Multiple Contracts
<br />-Building Commissioning and Training Services
<br />-Post Occupancy huts/ Evaluations
<br />-Renderings/ Models
<br />- Substantive Changes to Scope, Size or Complexity
<br />-Owner Requested Changes to Approved Documents
<br />-Reimbursable Expenses*
<br />Including, but not limited to, reproduction/ printing
<br />costs,
<br />travel expenses and special mail service expenses
<br />ement Form of Agreement Between Owner and Architect -
<br />Engineer.
<br />LI .. ra .__rr.* so a r•rs--n..: i -r~_: _ 1
<br />......u.... .
<br />
|