My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-18
CBCC
>
Ordinances
>
1980'S
>
1984
>
1984-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 12:00:26 PM
Creation date
2/1/2017 12:31:15 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1984-18
Adopted Date
04/04/1984
Ordinance Type
Water and Sewer
State Filed Date
04\27\1984
Entity Name
Sewer Connections
Impact Fees
Subject
Utilities (Water and Sewer) Connections
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equivalent residential units and impact fees shall be assessed on <br />the difference. <br />C. Escalation of impact fees. The basis for the impact <br />fees imposed by this section has been structured by the County <br />with respect to two major but variable factors. First, the <br />present level of construction cost of water distribution, sewer <br />collection, water treatment plant and wastewater treatment plant <br />facilities. Second, the theory of treatment facilities and their <br />relative degree of treatment system sophistication as prescribed <br />by the Florida Department of Health and Rehabilitative Services <br />and the Florida Department of Environmental Regulation. <br />The foregoing schedule of impact fees shall auto- <br />matically escalate based upon increases in utility construction <br />index published in the Engineering News Record magazine (ENR) (if <br />ENR goes out of business, an equivalent index -rill be used by the <br />County), entitled "twenty cities' construction cost index," using <br />as a base the published index for the quarter ending June 30, <br />1980. The County shall automatically adjust the impact fees set <br />forth herein semi-annually with the first such adjustment to be <br />not earlier than December 31, 1984. The automatic escalation <br />shall not exceed the percentage difference between said <br />construction cost index for the base period as compared with the <br />period in review. <br />D. Escalation of plant capacity fee by County Board of <br />County Commissioners. Separate and apart from the automatic esca- <br />lation provisions set forth above, the Utility Department of the <br />County may file with the Commission a higher or lower impact fee <br />schedule, and in support of that schedule, detail the reasons <br />requiring such increased fees. Such reasons may include and be <br />irelated to increasing standards of service; inadequate or <br />incorrect estimates of the total anticipated fees versus the <br />actual investment levels required by the County for water or sewer <br />plant treatment facilities; actual experience with regard to <br />matters of service area density having a direct bearing upon <br />assessments received versus the cost of construction of the <br />facilities; matters of net investment bearing upon rates and <br />-12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.