My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-304
CBCC
>
Official Documents
>
1990's
>
1997
>
1997-304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 2:41:17 PM
Creation date
2/8/2017 9:30:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/1997
Control Number
97-304
Entity Name
Waste Management of Florida
Subject
Operation Class 1 Landfill
Construction and Partial Closing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 2.2 - EROSION AND SEDIMENTATION CONTROL <br />2.01 Scope <br />The Work covered in this section shall include the materials, labor, installation, and maintenance <br />of all devices necessary for the control of erosion and sedimentation as shown on the plans as <br />stated in the operations permit and operations plan, or as directed by the Director. <br />2.02 General Requirements <br />The Contractor shall take necessary measures to minimize soil erosion, siltation, water pollution, <br />and air pollution. All devices and appropriate measures as required by the FDEP or the Florida <br />Department of Transportation Roadway and Traffic Design Standards (latest editions) shall be <br />installed prior to land disturbing activity and/or as work progresses. Failure on the part of the <br />Contractor to perform the necessary measures shall result in the following actions: <br />a. Notification to the Contractor of measures to be completed. <br />b. If the Contractor fails to perform as directed by the Director within twenty-four (24) <br />hours after notification, the Director may suspend work without extension of Agreement <br />time. <br />c. The Director shall allow the necessary work to be performed by other's at the <br />Contractor's expense. <br />2.03 Erosion and Siltation Control <br />The Contractor shall take reasonable precautions to prevent the eroding of soil and sedimentation <br />damage to the project site, surrounding water bodies, water courses, and adjacent property. The <br />Contractor shall be liable for any damages resulting from insufficient erosion and siltation <br />control measures. <br />2.04 Execution of Work <br />Temporary and permanent erosion control measures will be provided as required by existing site <br />permits, the FDOT standards or as directed by the Director. All temporary controls shall be <br />removed after site stabilization. <br />2.2-1 <br />bp0657104-1847 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.