Laserfiche WebLink
SECTION 2.2 - EROSION AND SEDIMENTATION CONTROL <br />2.01 Scope <br />The Work covered in this section shall include the materials, labor, installation, and maintenance <br />of all devices necessary for the control of erosion and sedimentation as shown on the plans as <br />stated in the operations permit and operations plan, or as directed by the Director. <br />2.02 General Requirements <br />The Contractor shall take necessary measures to minimize soil erosion, siltation, water pollution, <br />and air pollution. All devices and appropriate measures as required by the FDEP or the Florida <br />Department of Transportation Roadway and Traffic Design Standards (latest editions) shall be <br />installed prior to land disturbing activity and/or as work progresses. Failure on the part of the <br />Contractor to perform the necessary measures shall result in the following actions: <br />a. Notification to the Contractor of measures to be completed. <br />b. If the Contractor fails to perform as directed by the Director within twenty-four (24) <br />hours after notification, the Director may suspend work without extension of Agreement <br />time. <br />c. The Director shall allow the necessary work to be performed by other's at the <br />Contractor's expense. <br />2.03 Erosion and Siltation Control <br />The Contractor shall take reasonable precautions to prevent the eroding of soil and sedimentation <br />damage to the project site, surrounding water bodies, water courses, and adjacent property. The <br />Contractor shall be liable for any damages resulting from insufficient erosion and siltation <br />control measures. <br />2.04 Execution of Work <br />Temporary and permanent erosion control measures will be provided as required by existing site <br />permits, the FDOT standards or as directed by the Director. All temporary controls shall be <br />removed after site stabilization. <br />2.2-1 <br />bp0657104-1847 <br />• <br />