My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-304
CBCC
>
Official Documents
>
1990's
>
1997
>
1997-304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 2:41:17 PM
Creation date
2/8/2017 9:30:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/1997
Control Number
97-304
Entity Name
Waste Management of Florida
Subject
Operation Class 1 Landfill
Construction and Partial Closing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
grass (Pensacola variety) should be applied. To conserve soil, the intermediate cover <br />may be scraped back immediately before placement of additional solid waste on top of <br />the lift. The scraped back soil can be reused as cover material. <br />Final Cover <br />The final cover layering from bottom to top will consist of 18 inches of daily and <br />intermediate cover, a 40 mil HDPE or LLDPE geomembrane, a fabric -backed geonet, 18 <br />inches of load soil, and 6 inches of top soil. The top soil will be vegetated with <br />Pensacola Bahia grass placed as sod. This closure configuration meets Chapter 62- <br />701.600(5)(g), FAC, and 40 CFR Part 258 commonly known as the Subtitle "b" regulation <br />effective October 9,1993. The geomembrane barrier layer will have a permeability of <br />less than 1.0 (101' cm/sec, equal to the installed bottom liner geomembrane (Segment 2) <br />on the composite liner system used in the lateral expansion. <br />• <br />.J; <br />F-7 <br />'71,FM! <br />
The URL can be used to link to this page
Your browser does not support the video tag.