My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-304
CBCC
>
Official Documents
>
1990's
>
1997
>
1997-304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 2:41:17 PM
Creation date
2/8/2017 9:30:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/1997
Control Number
97-304
Entity Name
Waste Management of Florida
Subject
Operation Class 1 Landfill
Construction and Partial Closing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
}r; <br />I4 <br />a <br />«3 <br />•=r�astt t A,m <br />y.•`�i 'F ti Os?, a3 <br />working face, it is spread by a bulldozer. As additional stormwater management areas <br />and ditches are developed onsite or offsite, these areas will yield a new source of cover <br />material for future operations. <br />Daily Cover <br />At the end of each working day, the Class I refuse will be covered with a minimum of <br />six inches of compacted cover material. The landfill currently uses imported soil <br />supplemented with shredded wood wastes and shredded tires for daily cover. Cover <br />material minimizes rodent and vector problems and helps to mitigate windblown litter <br />and the possibility of fires spreading in the fill. Two passes with the equipment is <br />normally sufficient to compact the soil. Any remaining litter and cleanings from <br />equipment should be placed at the bottom of the completed cell and covered. Drainage <br />of the working face area and the borrow stockpile area should be checked and corrected <br />to minimize erosion, if necessary. Stormwater drainage diversion berms and temporary <br />piping shall be consistently placed to divert stormwater from the active fill area, and <br />filled areas with daily or intermediate cover. <br />Intermediate Cover <br />Intermediate cover is defined as that material which is to be placed on the landfill <br />surface in areas that will not receive final cover or an additional lift within 180 days. <br />Intermediate cover should be placed to a minimum compacted thickness of 12 inches on <br />top of the six inches of compacted daily cover. Any intermediate cover areas that will <br />not be landfilled on or capped with final cover within 180 days should be seeded or <br />covered with wood chips, hay straw or other appropriate cover material to minimize <br />slope erosion. For areas to be exposed for longer periods, a vegetative cover of bahia <br />v12053 F-6 <br />y7; <br />46, <br />1 • .. 1••• =-i... .. ✓w <br />
The URL can be used to link to this page
Your browser does not support the video tag.