Laserfiche WebLink
Article <br />GENERAL CONDITIONS <br />Table of Contents <br />Tills P0_# <br />1 Definitions ► GC -1 <br />2 Intent and Execution of Documents GC -2 <br />3 Clarifications and Detail Drawings GC -3 <br />4 Copies of Drawings and Specifications GC -3 <br />5 Materials, Equipment, Employees GC -3 <br />6 Royalties, Licenses and Patents GC -4 <br />7 Permits, Inspections, Fees, Regulations GC -4 <br />8 Protection of Work, Property and the Public GC -5 <br />9 Inspection of the Work GC -6 <br />10 Construction Supervision GC -6 <br />11 Separate Contracts and Contractor Relationships GC -7 <br />12 Subcontracts and Subcontractors GC -8 <br />13 Contractor and Subcontractor Relationships (Not Used) GC -8 <br />14 Director's Status GC -8 <br />15 Changes in the Work GC -9 <br />16 Claims for Extra Cost GC -11 <br />17 Minor Changes in the Work GC -11 <br />18 Uncorrected Faulty Work GC -11 <br />19 Correction of Work Before Final Payment GC -11 <br />20 Correction of Work After Final Payment GC -12 <br />21 County's Right to do Work GC -12 <br />22 Termination for Cause GC -12 <br />23 Payments for Class I Landfill Operations and Maintenance GC -13 <br />24 Payments Withheld GC -14 <br />25 Insurance GC -14 <br />26 Irrevocable Letter of Credit GC -16 <br />27 Force Majeure GC -16 <br />28 Assignments GC -17 <br />29 Use of Premises GC -17 <br />30 Cutting, Patching, and Digging GC -17 <br />31 Guarantee GC -17 <br />32 Codes and Standards GC -17 <br />33 Indemnification GC -18 <br />34 Taxes GC -19 <br />35 Equal Opportunity Clause GC -19 <br />36 Additional General Conditions GC -19 <br />ii <br />b00656%043O47 <br />