Laserfiche WebLink
18-4 ANCILLARY FACILITIES <br />IB -4.1 Genes <br />Facilities are in place at the landfill to provide a suitable working environment to landfill <br />employees. These include a scale house, paved access roads, an administration building and <br />maintenance facilities. 1RCSWDD (the Owner) will provide office space and a maintenance area <br />for the Contractor as shown in the administration/maintenance building floor plan. (See <br />Attachment C). Common areas such as lunch room, bathroom and parking lot will be shared by <br />both parties. The construction project work shall be performed out of temporary facilities <br />provided by the Contractor and located as shown on the plans and directed in the Specifications. <br />IB -4.2 Adminisuatianaingmagraancrjhulding <br />A 40 by 90 foot building is in place as a landfill administration office. The building consists of <br />five offices, a reception area, a break room equipped with a kitchen, a bath with shower, and a <br />large storage room. Contractor's use area is delineated on the building floor plan. A sanitary <br />sewer system and potable water supply have been installed by the County. Electric service, <br />potable water service and wastewater service is to be provided by the County. Contractor shall <br />pay a prorated share of electric, water and wastewater user charges based on square footage of the <br />maintenance and administration building area used by Contractor. Contractor shall be <br />responsible for installation and use of Contractor telephone lines and payment of phone charges. <br />County shall maintain the exterior, interior offices, and shared use areas of the administration <br />building. Contractor shall maintain the Maintenance Building interior to keep it equal or better <br />than its present condition. <br />To provide for receipt of wastes, the SWDD operates inbound and outbound 50 ton digital <br />platform scales. An asphalt surfaced main access road has been constructed to provide all <br />weather access from the scales to the Class I Landfill cells. <br />18-4.3 Access Roads <br />Maintenance and repair of the paved access road from the Scale House to the Class I cells and the <br />construction, maintenance, and repair of additional stone surfaced roads to the working face area <br />shall be the responsibility of the Contractor. <br />1B-3 <br />bp0617n0,20.97 <br />