My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-304
CBCC
>
Official Documents
>
1990's
>
1997
>
1997-304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 2:41:17 PM
Creation date
2/8/2017 9:30:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/1997
Control Number
97-304
Entity Name
Waste Management of Florida
Subject
Operation Class 1 Landfill
Construction and Partial Closing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />control it. Contractor shall pay sewer user charges to Indian River County for leachate treatment. <br />Any increase in user fees will be tied to Consumer Price Index, calculated using the methodology <br />in Section SC -2. No Contractor markup for overhead or profit will be allowed due to increased <br />user. rates. <br />1.3.6 Completion of Landfill Phases <br />The proposed closure plan for the Class I landfill is to install the closure cap system at specific <br />elevations. Partial closure of the Class I mound is proposed at 95 and 130 feet NGVD. In <br />anticipation of partial closure, the County shall contract for engineering design services. As <br />stated in 1.3.4(c), phased closure will be a new construction project, with construction negotiated <br />with the Contractor or competitively bid. <br />1.3.7 Operation During Inclement Weather <br />To minimize the adverse impact of wet weather on landfill operations, provisions shall be made <br />either to reserve a wet weather fill area readily accessible from the all-weather on-site road or to <br />provide crushed stone or other suitable surfacing on the temporary on-site road leading from the <br />all-weather road to the working face. In addition, an emergency stockpile of cover material <br />sufficient to provide cover for at least five days, shall be maintained near the wet weather fill <br />arca. The supply of emergency cover material shall be replenished as soon as weather and <br />ground conditions permit. Surface runoff shall be diverted around the stockpile to prevent <br />ponding of water on the landfill surface. <br />1.3.8 Special Waste Disposal <br />The types of wastes listed below shall not be accepted at the Class I Landfill. The list of <br />unacceptable wastes and handling procedures shall be periodically updated to reflect actual <br />operating experience. <br />If any hazardous, infectious, or unacceptable waste is detected in a delivery, the waste, truck, and <br />driver shall be isolated and the Contractor shall follow the County Waste Screening Plan to <br />notify the appropriate authorities. <br />UNACCEPTABLE WASTES <br />All hazardous wastes as defined by Chapter 62-730 - Florida Administrative Code <br />All infectious wastes except as provided by the Florida Solid Waste Management Rules <br />Liquid Waste <br />Unexpended pesticide containers <br />Raw sewage sludge <br />Septic tank pumpings <br />Raw manure <br />Bulk liquids <br />Semisolids <br />Industrial process sludges <br />1.3-4 <br />bpiI6S7104.1L97 <br />C <br />
The URL can be used to link to this page
Your browser does not support the video tag.