Laserfiche WebLink
In addition, the Contractor shall provide all equipment required for any negotiated on-site or <br />adjacent site borrow operations, and for operation and maintenance of the Class I landfill and <br />ancillary facilities in accordance with the Agreement and the rules and regulations of the Florida <br />Department of Environmental Protection. Each item of equipment shall be specifically designed <br />for the function it performs and shall be maintained in good working order at all times. The <br />manufacturer's recommendations regarding Specifications for landfill operation shall be <br />followed. Only equipment required for the Work, including essential backup units, and which is <br />in good working order or undergoing expeditious repair will be permitted at the landfill site. <br />Equipment shall be stored in a location and manner to minimize its visibility to persons off the <br />landfill site. <br />Back up alarms shall be provided and maintained in proper working condition for all landfill <br />heavy equipment. <br />1.5-2 <br />b3rM-I1147 <br />