My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-304
CBCC
>
Official Documents
>
1990's
>
1997
>
1997-304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 2:41:17 PM
Creation date
2/8/2017 9:30:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/1997
Control Number
97-304
Entity Name
Waste Management of Florida
Subject
Operation Class 1 Landfill
Construction and Partial Closing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1.6 - ENVIRONMENTAL MONITORING AND CONTROL <br />1.6.1 Dust <br />Whenever dusty conditions prevail, the unloading area and the newly discharged solid waste <br />shall be sprinkled with water as required to control dust. The paved on-site roads to the Class i <br />area shall be swept frequently and the other on-site roads and surfaced areas shall be treated with <br />water to effectively control dust. All areas subject to traffic, including areas traversed by earth <br />moving equipment in excavating, hauling, and spreading cover material, shall be sprinkled with <br />water, if required, for dust control. Newly covered areas of the fill shall be sprinkled if <br />necessary. Water can be obtained from the stormwater pond or from the sedimentation ponds, <br />and generally shall be hauled and sprinkled by tank truck. Areas inaccessible by truck shall be <br />sprinkled by hoses. If surface water sources are inadequate, the Contractor shall obtain necessary <br />water from other non -potable on-site sources with permission of the Landfill Supervisor. Water <br />from the potable supply system at the administration/maintenance building shall not be used for <br />dust control. Tank trucks shall not be refilled from the potable water supply system. <br />1.6.2 Litter <br />Portable litter screens shall be provided by the Contractor and shall be arranged downwind of the <br />working face of the fill. The screens shall be kept as close to the working area as possible <br />without unduly interfering with the landfill operation and shall be moved promptly when <br />required by changes in wind direction or progress of the fill. Additional screens or alternate <br />measures shall be employed by the Contractor as required to keep blowing litter from escaping <br />the working area. <br />Daily monitoring and cleanup of all roadside dumpings and all litter shall be provided for the • <br />following areas: <br />• The Class I Landfill within the operations area including the portable litter screens and <br />fences. <br />�+ The slopes or Segment 1, at the Inn segment, and Seg,;;eiit D: slid all aeras between the <br />landfill cell side slopes and the north and west property lines of the landfill site. <br />• The paved Class I access road from the scale house to the west fence line. <br />• All swales, ditches, and stormwater structures immediately adjacent to Class I areas or <br />adjacent to the Class 1 access mad. <br />a Areas requ;i 4 cleanup as a result of bJotviitg or~ drbppW Class I waste. <br />All monitoring and cleanup of litter shall be performed to a quality standard satisfactory tb the <br />County Landfill Supervisor. All collected materials shall be disposed of in the landfill. <br />6. <br />1.6-1 <br />bg0657104-18-97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.