My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-304
CBCC
>
Official Documents
>
1990's
>
1997
>
1997-304
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 2:41:17 PM
Creation date
2/8/2017 9:30:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/04/1997
Control Number
97-304
Entity Name
Waste Management of Florida
Subject
Operation Class 1 Landfill
Construction and Partial Closing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.01 Availability <br />The Contractor shall be responsible for purchase excavating, hauling and placement of soils used <br />in landfill operations and maintenance. <br />2.02 Classifications <br />a. The soils used for embankment, drainage ways, compacted soil cover, and subgrade <br />construction (underlining systems) shall be inorganic sands and silts free of roots, woody <br />vegetation and other deleterious material. The maximum permissible soil clod size <br />Contained in the landfill cover shall be 4 inches. Frequency of deleterious material shall <br />be such that its presence does not adversely affect the landfill operation. <br />b. Topsoil may consist of a mixture of organic clay, silt, and sandy loams containing root <br />fibers, capable of supporting grasses. <br />Part 3 - Construction <br />3.01 General <br />a. Prior to the start of operations, the Contractor shall submit to the County, for review, the <br />proposed procedures in connection with excavation, moving, placing, and disposition of <br />all materials. Contractor shall not import unsuitable material onto the landfill site. <br />b. If the Contractor purchases borrow from the County, and operates the borrow operations, <br />the Contractor shall strip all topsoil from excavation and fill sites. Topsoil shall be <br />stockpiled for future use in final grading and establishing vegetative cover on the <br />completed landfill. If borrow is purchased from the County any material determined <br />unsuitable shall be disposed of within site boundaries where directed by the County. <br />c. The Contractor shall inform and satisfy himself as to the character, quantity and <br />distribution of all material to be excavated. No material shall be removed from the site <br />without the written approval of the County. All stockpile areas shall be leveled to a <br />uniform line and section and shall present a neat appearance. <br />3.02 Excavation <br />a. Any onsite excavation to obtain borrow for landfilling operations through a borrow <br />contract with the County shall be performed as indicated on the stormwater permit <br />Drawings which are available from the Solid Waste Disposal District or Engineer (Camp <br />Dresser .& McKee Inc.). <br />b. The Contractor shall be responsible for ensuring positive drainage of all existing and <br />newly graded areas and other construction areas to the stormwater pond south of Segment <br />I and Segment II. During each phase of the Work, all necessary temporary erosion <br />control measures and devices and drainage ditches shall be provided at no additional cost <br />to the County. <br />2.1-2 <br />0911657101-11147 <br />ArtPixTIFVERVAVIRPM <br />
The URL can be used to link to this page
Your browser does not support the video tag.