My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS <br /> ARTICLE 1 - DEFINITIONS AND TERMINOLOGY Price or the Contract Times, issued on or after the j <br /> Effective Date of the Agreement. <br /> 1.01 Defined Terms 10. Claim--A demand or assertion by <br /> OWNER or CONTRACTOR seeking an adjustment of i <br /> A. Wherever used in the Contract Documents Contract Price or Contract Times, or both, or other <br /> and printed with initial or all capital letters, the terms relief with respect to the terms of the Contract. A i <br /> listed below will have the meanings indicated which demand for money or services by a third party is not a <br /> are applicable to both the singular and plural thereof. Claim. <br /> i <br /> 1. Addenda—Written or graphic instruments 11. Contract--The entire and integrated <br /> issued prior to the opening of Bids which clarify, written agreement between the OWNER and <br /> correct, or change the Bidding Requirements or the CONTRACTOR concerning the Work. The Contract <br /> Contract Documents. supersedes prior negotiations, representations, or i <br /> agreements,whether written or oral. <br /> 2. Agreement—The written instrument which <br /> is evidence of the agreement between OWNER and 12. Contract Documents--The Contract <br /> CONTRACTOR covering the Work. Documents establish the rights and obligations of the <br /> parties and include the Agreement, Addenda (which <br /> 3. Application for Payment--The form pertain to the Contract Documents), CONTRACTOR's <br /> acceptable to ENGINEER which is to be used by Bid (including documentation accompanying the Bid <br /> CONTRACTOR during the course of the Work in and any post Bid documentation submitted prior to the <br /> requesting progress or final payments and which is to Notice of Award) when attached as an exhibit to the <br /> be accompanied by such supporting documentation Agreement, the Notice to Proceed, the Bonds, these i <br /> as is required by the Contract Documents. General Conditions, the Supplementary Conditions, <br /> the Specifications and the Drawings as the same are <br /> 4. Asbestos--Any material that contains more specifically identified in the Agreement, together i <br /> more than one percent asbestos and is friable or is with all Written Amendments, Change Orders, Work <br /> releasing asbestos fibers into the air above current Change Directives, Field Orders, and ENGINEER's <br /> action levels established by the United States Occupa- written interpretations and clarifications issued on or <br /> tional Safety and Health Administration. after the Effective Date of the Agreement. Approved <br /> Shop Drawings and the' reports and drawings of <br /> 5. Bid—The offer or proposal of a bidder subsurface and physical conditions are not Contract <br /> submitted on the prescribed form setting forth the Documents. Only printed or hard copies of the items <br /> prices for the Work to be performed. listed in this paragraph are Contract Documents. Files <br /> in electronic media format of text, data, graphics, and <br /> 6. Bidding Documents--The Bidding the like that may be furnished by OWNER to <br /> Requirements and the proposed Contract Documents CONTRACTOR are not Contract Documents. <br /> (including all Addenda issued prior to receipt of Bids). <br /> 13. Contract Price--The moneys payable by <br /> 7. Bidding Requirements—The OWNER to CONTRACTOR for completion of the <br /> Advertisement or Invitation to Bid, Instructions to Work in accordance with the Contract Documents as <br /> Bidders, Bid security form, if any, and the Bid form stated in the Agreement (subject to the provisions of <br /> with any supplements. paragraph 11.03 in the case of Unit Price Work). <br /> 8. Bonds--Performance and payment bonds 14. Contract Times--The number of days or <br /> and other instruments of security. the dates stated in the Agreement to: (i) achieve <br /> Substantial Completion; and (ii) complete the Work so <br /> 9. Change Order--A document recommend- that it is ready for final payment as evidenced by i <br /> ed by ENGINEER which is signed by CONTRACTOR ENGINEER's written recommendation of final pay- <br /> and OWNER and authorizes an addition, deletion, or ment. <br /> revision in the Work or an adjustment in the Contract <br /> I <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-5 <br /> F-\Public Works\ENGINEERING DIVISION PROJECTS\l 123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr West\Admim\bid documents\tetaster Contract Documents\00700-General Conditions <br /> REV 5-10-13.dac <br /> f <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.