My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 15. CONTRACTOR--The individual or entity <br /> with whom OWNER has entered into the Agreement. 26. Liens-Charges, security interests, or <br /> encumbrances upon Project funds, real property, or <br /> 16. Cost of the Work-See paragraph 11.01.A personal property. <br /> for definition. <br /> 27. Milestone--A principal event specified in <br /> 17. Drawings--That part of the Contract the Contract Documents relating to an intermediate <br /> Documents prepared or approved by ENGINEER completion date or time prior to Substantial Comple- <br /> which graphically shows the scope, extent, and tion of all the Work. <br /> character of the Work to be performed by <br /> CONTRACTOR. Shop Drawings and other 28. Notice of Award--The written notice by <br /> CONTRACTOR submittals are not Drawings as so OWNER to the apparent successful bidder stating that <br /> defined. upon timely compliance by the apparent successful <br /> bidder with the conditions precedent listed therein, <br /> 18. Effective Date of the Agreement--The OWNER will sign and deliver the Agreement. <br /> date indicated in the Agreement on which.it becomes <br /> effective, but if no such date is indicated, it means the 29. Notice to Proceed--A written notice given <br /> date on which the Agreement is signed and delivered by OWNER to CONTRACTOR fixing the date on <br /> by the last of the two parties to sign and deliver. which the Contract Times will commence to run and <br /> on which CONTRACTOR shall start to perform the <br /> 19. ENGINEER-The individual or entity Work under the Contract Documents. <br /> named as such in the Agreement. <br /> 30. OWNER--The individual, entity, public <br /> 20 EntGINEER�s Consultant A., individual „ body, or authority with whom CONTRACTOR has <br /> entity having a ,GntraGt with ENGINEER to furnish entered into the Agreement and for whom the Work is <br /> services as ENGIA EER's independent w afessional to be performed. <br /> w;o- -ide^+fi„ as� the SupplemeRt@Fy 31. Partial Utilization-Use by OWNER of a <br /> Conditions. substantially completed part of the Work for the pur- <br /> pose for which it is intended (or a related purpose) <br /> 21. Field Order--A written order issued by prior to Substantial Completion of all the Work. <br /> ENGINEER which requires minor changes in the <br /> Work but which does not involve a change in the 32. PCBs-Polychlorinated biphenyls. <br /> Contract Price or the Contract Times. <br /> 33. Petroleum-Petroleum, including crude oil <br /> 22. General Requirements--Sections of or any fraction thereof which is liquid at standard <br /> Division 1 of the Specifications. The General conditions of temperature and pressure (60 degrees <br /> Requirements pertain to all sections of the Specifica- Fahrenheit and 14.7 pounds per square inch <br /> tions. absolute), such as oil, petroleum,fuel oil, oil sludge, oil <br /> refuse, gasoline, kerosene, and oil mixed with other <br /> 23. Hazardous Environmental Condition--The non-Hazardous Waste and crude oils. <br /> presence at the Site of Asbestos, PCBs, Petroleum, <br /> Hazardous Waste, or Radioactive Material in such 34. Project-The total construction of which <br /> quantities or circumstances that may present a the Work to be performed under the Contract <br /> substantial danger to persons or property exposed Documents may be the whole, or a part as may be <br /> thereto in connection with the Work. indicated elsewhere in the Contract Documents. <br /> 24. Hazardous Waste-The term Hazardous 35. Project Manual-The bound documentary <br /> Waste shall have the meaning provided in Section information prepared for bidding and constructing the <br /> 1004 of the Solid Waste Disposal Act (42 USC Work. A listing of the contents of the Project Manual, <br /> Section 6903)as amended from time to time. which may be bound in one or more volumes, is <br /> contained in the table(s)of contents. <br /> 25. Laws and Regulations; Laws or Regulat- <br /> ions-Any and all applicable laws, rules, regulations, 36. Radioactive Material-Source, special <br /> ordinances, codes, and orders of any and all govern- nuclear, or byproduct material as defined by the <br /> mental bodies, agencies, authorities, and courts Atomic Energy Act of 1954 (42 USC Section 2011 et <br /> having jurisdiction. seq.)as amended from time to time. <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-6 <br /> l"Tublic Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Or West\Admim\bid documents\Master Contract Documents\00700- <br /> General Conditions REV 510-13.doc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.