My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER as to the Work, it is intended that such materials, er-eg4prreril, -_.hall —e-aR to furnish <br /> action or determination will be solely to evaluate, in and instal4 said services, materials, or <br /> general, the completed Work for compliance with eg iprAen} ^^mnlete and ready fer intended <br /> the requirements of and information in the Contract use. <br /> Documents and conformance with the design <br /> concept of the completed Project as a functioning 4. When "furnish," "install," "perform," or <br /> whole as shown or indicated in the Contract "provide" is not used in connection with services, <br /> Documents (unless there is a specific statement materials, or equipment in a context clearly <br /> indicating otherwise). The use of any such term or requiring an obligation of CONTRACTOR, <br /> adjective shall not be effective to assign to ENGI- "provide"is implied. <br /> NEER any duty or authority to supervise or direct <br /> the performance of the Work or any duty or E. Unless stated otherwise in the Contract Docu- <br /> authority to undertake responsibility contrary to the ments, words or phrases which have a well-known <br /> provisions of paragraph 9.10 or any other provision technical or construction industry or trade meaning are <br /> of the Contract Documents. used in the Contract Documents in accordance with <br /> such recognized meaning. <br /> B. Day <br /> 1. The word "day" shall constitute a ARTICLE 2-PRELIMINARY MATTERS <br /> calendar day of 24 hours measured from <br /> midnight to the next midnight. <br /> 2.01 Delivery of Bonds <br /> C. Defective <br /> A. When CONTRACTOR delivers the executed <br /> 1. The word"defective,"when modifying Agreements to OWNER, CONTRACTOR shall also <br /> the word "Work," refers to Work that is deliver to OWNER such Bonds as CONTRACTOR <br /> unsatisfactory, faulty, or deficient in that it does may be required to furnish. <br /> not conform to the Contract Documents or does <br /> not meet the requirements of any inspection, 2.02 Copies of Documents <br /> reference standard, test, or approval referred to <br /> in the Contract Documents, or has been A. OWNER shall furnish to CONTRACTOR up <br /> damaged prior to ENGINEER's recom- to ten copies of the Contract Documents. Additional <br /> mendation of final payment (unless responsi- copies will be furnished upon request at the cost of <br /> bility for the protection thereof has been reproduction. <br /> assumed by OWNER at Substantial <br /> Completion in accordance with paragraph 2.03 Commencement of Contract Times, Notice <br /> 14.04 or 14.05). to Proceed <br /> D. Furnish, Install, Perform, Provide A. The Contract Times will commence to run on <br /> the thirtieth day after the Effective Date of the Agree- <br /> 1. The word 44nish,"\when—used in ment or, if a Notice to Proceed is given, on the day <br /> GorIneotion with seFViGes, materials, er indicated in the Notice to Proceed. A Notice to Pro- <br /> it, shall mean to supply and delive may be given at any time within 30 days after the <br /> seriiGes, material-;—r Rent to the Effective Date of the Agreement. In no event will the <br /> Site (or seme other speGified loGatiori) ready for Contract Times commence to run later than the <br /> use or iristallatien and iR usable or i ninetieth day after the day of Bid opening or the <br /> GOnciffitoon. thirtieth day after the Effective Date of the Agreement, <br /> whichever date is earlier. <br /> 2. The wend"instar"when—used—iR <br /> GOnnestien with services, materials,' er 2.04 Starting the Work <br /> iI it shall moan to put into <br /> or h_e <br /> in final—position said sewiGes, materials, e A. CONTRACTOR shall start to perform the <br /> equipment GGFnplete and ready for Work on the date when the Contract Times com- <br /> use. mence,to run. No Work shall be done at the Site prior <br /> to the date on which the Contract Times commence to <br /> 3. The words "perferm" or " re ride" run. <br /> when used in Gonneotion—Jnrith --- <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-8 <br /> RNPublic WorWENGINEE RING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr West\Admlm\bld documents\Master Contract Documents\00700- <br /> General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.