My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 2.05 Before Starting Construction 2.06 Preconstruction Conference j <br /> I <br /> A. CONTRACTOR's Review of Contract Docu- A. Within 20 days aftef thn, tract Times start j <br /> ments: Before undertaking each part of the Work, to run, but befere aRy W9Fk at the Site is stu ted,a <br /> CONTRACTOR shall carefully study and compare theG1A1„. , <br /> Contract Documents and check and verify pertinent and etheFs as appropriate well be held tG establish a <br /> figures therein and all applicable field measurements. weFking UlPiderstandiRq among the parties as te the <br /> CONTRACTOR shall promptly report in writing to <br /> Werk and to diSGUSS the sGhedules refeFFed to in para- <br /> ENGINEER any conflict, error, ambiguity, or <br /> discrepancy which CONTRACTOR may discover and and ether submittals, pNGessin 9 °� pp:;oafions-fb <br /> shall obtain a written interpretation or clarification from Payment, and maintaining requiFed reGGF <br /> ENGINEER before proceeding with any Work affected i <br /> thereby; however, CONTRACTOR shall not be liable 2.07 Initial Acceptance of Schedules <br /> to OWNER or ENGINEER for failure to report any <br /> conflict, error, ambiguity, or discrepancy in the A. Unless otherwise provided in the Contract <br /> Contract Documents unless CONTRACTOR knew or Documents, at least ten days before submission of the j <br /> reasonably should have known thereof. first Application for Payment a conference attended by <br /> CONTRACTOR, ENGINEER, and others as appropri- <br /> B. Preliminary Schedules: Within ten days after ate will be held to review for acceptability to ENGI- <br /> the Effective Date of the Agreement(unless otherwise NEER as provided below the schedules submitted in <br /> specified in the General Requirements), CONTRAC- accordance with paragraph 2.05.6. CONTRACTOR <br /> TOR shall submit to ENGINEER for its timely review: shall have an additional ten days to make corrections j <br /> and adjustments and to complete and resubmit the i <br /> 1. a preliminary progress schedule schedules. No progress payment shall be made to <br /> indicating the times(numbers of days or dates) CONTRACTOR until acceptable schedules are <br /> for starting and completing the various stages submitted to ENGINEER. <br /> of the Work, including any Milestones specified <br /> in the Contract Documents; 1. The progress schedule will be <br /> acceptable to ENGINEER if it provides an <br /> 2. a preliminary schedule of Shop orderly progression of the Work to completion <br /> Drawing and Sample submittals which will list within any specified .Milestones and the <br /> each required submittal and the times for sub- Contract Times. Such acceptance will not <br /> miffing, reviewing, and processing such impose on ENGINEER responsibility for the <br /> submittal; and progress schedule, for sequencing, scheduling, <br /> or progress of the Work nor interfere with or f <br /> 3. a preliminary schedule of values for relieve CONTRACTOR from CONTRACTOR's <br /> all of the Work which includes quantities and full responsibility therefor. j <br /> prices of items which when added together <br /> equal the Contract Price and subdivides the 2. CONTRACTOR's schedule of Shop <br /> Work into component parts in sufficient detail to Drawing and Sample submittals will be <br /> serve as the basis for progress payments acceptable to ENGINEER if it provides a <br /> during performance of the Work. Such prices workable arrangement for reviewing and j <br /> will include an appropriate amount of overhead processing the required submittals. I <br /> and profit applicable to each item of Work. <br /> 3. CONTRACTOR's schedule of values <br /> will be acceptable to ENGINEER as to form <br /> the Site is .{,.rt.d, GONTQAGTOR uRd OWNER shall <br /> and substance if it provides a reasonable <br /> eas#—deliver t9 the otheF,with -sepies—to—each allocation of the Contract Price to component <br /> add;tieRal insured identified On the SupplernentaFy parts of the Work. <br /> GendefiaRs> I <br /> ey'deRne of n...u au Ge whish oi4hor f th m eany <br /> I <br /> �...�� .r-rrvr r-��crro <br /> AFflGIe 5. <br /> f <br /> I <br /> 00700-General Conditions REV 510.13 <br /> 00700-9 <br /> F\Public WorkstENGINEERING DIVISION PROJECTS11123 43rd Ave Sidewalk Improvements 26th St,to Airport Dr WestMmimlbid documentsWaster Contract Documentsl00700- <br /> General Conditions REV 510-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.