Laserfiche WebLink
i <br /> i <br /> i <br /> I <br /> I <br /> ARTICLE 6-CONTRACTOR'S RESPONSIBILITIES 6.03 Services, Materials, and Equipment <br /> A. Unless otherwise specified in the General Re- <br /> 6.01 Supervision and Superintendence quirements, CONTRACTOR shall provide and <br /> assume full responsibility for all services, materials, <br /> A. CONTRACTOR shall supervise, inspect, and equipment, labor, transportation, construction I <br /> direct the Work competently and efficiently, devoting equipment and machinery, tools, appliances, fuel, <br /> such attention thereto and applying such skills and power, light, heat, telephone, water, sanitary facilities, <br /> expertise as may be necessary to perform the Work in temporary facilities, and all other facilities and <br /> accordance with the Contract Documents. CON- incidentals necessary for the performance, testing, <br /> TRACTOR shall be solely responsible for the means, start-up, and completion of the Work. <br /> methods, techniques, sequences, and procedures of <br /> construction, but CONTRACTOR shall not be B. All materials and equipment incorporated into <br /> responsible for the negligence of OWNER or the Work shall be as specified or, if not specified, shall <br /> ENGINEER in the design or specification of a specific be of good quality and new, except as otherwise <br /> means, method, technique, sequence, or procedure of provided in the Contract Documents. All warranties j <br /> construction which is shown or indicated in and and guarantees specifically called for by the Specifica- <br /> expressly required by the Contract Documents. CON- tions shall expressly run to the benefit of OWNER. If <br /> TRACTOR shall be responsible to see that the required by ENGINEER, CONTRACTOR shall furnish <br /> completed Work complies accurately with the Contract satisfactory evidence (including reports of required i <br /> Documents. tests) as to the source, kind, and quality of materials <br /> and equipment. All materials and equipment shall be <br /> B. At all times during the progress of the Work, stored, applied, installed, connected, erected, <br /> CONTRACTOR shall assign a competent resident protected, used, cleaned, and conditioned in <br /> superintendent thereto who shall not be replaced accordance with instructions of the applicable <br /> without written notice to OWNER and ENGINEER Supplier, except as otherwise may be provided in the <br /> except under extraordinary circumstances. The Contract Documents. <br /> superintendent will be CONTRACTOR's <br /> representative at the Site and shall have authority to 6.04 Progress Schedule <br /> act on behalf of CONTRACTOR. All communications <br /> given to or received from the superintendent shall be A. CONTRACTOR shall adhere to the progress <br /> binding on CONTRACTOR. schedule established in accordance with paragraph <br /> 2.07 as it may be adjusted from time to time as <br /> 6.02 Labor, Working Hours provided below. i <br /> A. CONTRACTOR shall provide competent, 1. CONTRACTOR shall submit to <br /> suitably qualified personnel to survey, lay out, and ENGINEER for acceptance (to the extent indi- <br /> construct the Work as required by the Contract Docu- cated in paragraph 2.07) proposed adjustments <br /> ments. CONTRACTOR shall at all times maintain in the progress schedule that will not result in <br /> good discipline and order at the Site. changing the Contract Times (or Milestones). <br /> Such adjustments will conform generally to the <br /> B. Except as otherwise required for the safety or progress schedule then in effect and additional- <br /> protection of persons or the Work or property at the ly will comply with any provisions of the General <br /> Site or adjacent thereto, and except as otherwise Requirements applicable thereto. <br /> stated in the Contract Documents, all Work at the Site <br /> shall be performed during regular working hours, and 2. Proposed adjustments in the <br /> CONTRACTOR will not permit overtime work or the progress schedule that will change the Contract <br /> performance of Work on Saturday, Sunday, or any Times (or Milestones) shall be submitted in <br /> legal holiday without OWNER's written consent(which accordance with the requirements of Article 12. <br /> will not be unreasonably withheld) given after prior Such adjustments may only be made by a <br /> written notice to ENGINEER. Change Order or Written Amendment in accor- <br /> dance with Article 12. <br /> i <br /> I <br /> I <br /> 00700-General Conditions REV 5-10-13 i <br /> 00700-19 <br /> P%Public Works4ENGINEERING DIVISION PROJECM1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr West\Admim\bid documentsWasler Contract Documents\00700- <br /> General Conditions REV 5-10-13.doc <br /> I <br />