Laserfiche WebLink
i <br /> 6.05 Substitutes and"Or-Equals" b. CONTRACTOR shall submit suffi- <br /> cient information as provided below to allow <br /> I <br /> A. Whenever an item of material or equipment is ENGINEER to determine that the item of <br /> specified or described in the Contract Documents by material or equipment proposed is <br /> using the name of a proprietary item or the name of a essentially equivalent to that named and an <br /> particular Supplier, the specification or description is acceptable substitute therefor. Requests for <br /> intended to establish the type, function, appearance, review of proposed substitute items of <br /> and quality required. Unless the specification or material or equipment will not be accepted <br /> description contains or is followed by words reading by ENGINEER from anyone other than <br /> that no like, equivalent, or "or-equal" item or no CONTRACTOR. <br /> substitution is permitted, other items of material or <br /> equipment or material or equipment of other Suppliers c. The procedure for review by ENGI- <br /> may be submitted to ENGINEER for review under the NEER will be as set forth in paragraph <br /> circumstances described below. 6.05.A.2.d; as supplemented in the General <br /> Requirements and as ENGINEER may <br /> 1. "Or-Equal" Items: If in ENGINEER's decide is appropriate under the <br /> sole discretion an item of material or equipment circumstances. <br /> proposed by CONTRACTOR is functionally <br /> equal to that named and sufficiently similar so d. CONTRACTOR shall first make <br /> that no change in related Work will be required, written application to ENGINEER for review <br /> it may be considered by ENGINEER as an of a proposed substitute item of material or <br /> "or-equal" item, in which case review and equipment that CONTRACTOR seeks to <br /> approval of the proposed item may, in furnish or use. The application shall certify <br /> ENGINEER's sole discretion, be accomplished that the proposed substitute item will <br /> without compliance with some or all of the perform adequately the functions and <br /> requirements for approval of proposed substi- achieve the results called for by the general <br /> tute items. For the purposes of this paragraph design, be similar in substance to that <br /> 6.05.A.1, a proposed item of material or specified, and be suited to the same use as <br /> equipment will be considered functionally equal that specified. The application will state the <br /> to an item so named if: extent, if any, to which the use of the pro- <br /> posed substitute item will prejudice <br /> a. in the exercise of reasonable CONTRACTOR's achievement of Substan- <br /> judgment ENGINEER determines that: (i) it tial Completion on time, whether or not use <br /> is at- .least equal in quality, durability, of the proposed substitute item in the Work <br /> appearance, strength, and design will require a change in any of the Contract <br /> characteristics; (ii) it will reliably perform at Documents(or in the provisions of any other <br /> least equally well the function imposed by direct contract with OWNER for work on.the <br /> the design concept of the completed Project Project) to adapt the design to the proposed <br /> as a functioning whole,and; substitute item and whether or not <br /> incorporation or use of the proposed substi- <br /> b. CONTRACTOR certifies that: (i) tute item in connection with the Work is sub- <br /> there is no increase in cost to the OWNER; ject to payment of any license fee or royalty <br /> and (ii) it will conform substantially, even All variations of the proposed substitute <br /> with deviations, to the detailed requirements item from that specified will be identified in <br /> of the item named in the Contract the application, and available engineering, <br /> Documents. sales, maintenance, repair, and <br /> replacement services will be indicated. The <br /> 2. Substitute Items application will also contain an itemized esti- <br /> mate of all costs or credits that will result <br /> a. If in ENGINEER's sole discretion an directly or indirectly from use of such <br /> item of material or equipment proposed by substitute item, including costs of redesign <br /> CONTRACTOR does not qualify as an and claims of other contractors affected by I <br /> "or-equal" item under paragraph 6.05.A..1, it any resulting change, all of which will be <br /> will be considered a proposed substitute considered by ENGINEER in evaluating the I <br /> item. proposed substitute item. ENGINEER may <br /> require CONTRACTOR to furnish additional <br /> data about the proposed substitute item. <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-20 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th SL to Airport Dr WesMdmimlbid documentslMaster Contract Documents\007D0- <br /> General Conditions REV 5-10-13.doc <br /> I <br /> I <br /> I <br /> I <br />