<br /> are unable to agree on entitlement to or on the or occupant against OWNER, ENGINEER, or
<br /> amount or extent, if any, of any such adjustment, a any other party indemnified hereunder to the
<br /> Claim may be made therefor as provided in paragraph extent caused by or based upon
<br /> 10.05. CONTRACTOR's performance of the Work.
<br /> 6.10 Taxes B. Removal of Debris During Performance of the
<br /> Work. During the progress of the Work CONTRAC-
<br /> A. CONTRACTOR shall pay all sales, consum- TOR shall keep the Site and other areas free from j
<br /> er, use, and other similar taxes required to be accumulations of waste materials, rubbish, and other
<br /> paid by CONTRACTOR in accordance with debris. Removal and disposal of such waste mated-
<br /> the Laws and Regulations of the place of the als, rubbish, and other debris shall conform to applica
<br /> Project which are applicable during the ble Laws and Regulations.
<br /> performance of the Work.
<br /> C. Cleaning: Prior to Substantial Completion of
<br /> B. OWNER qualifies for state and local sales tax the Work CONTRACTOR shall clean the Site and
<br /> exemption in the purchase of all material and make it ready for utilization by OWNER. At the com-
<br /> equipment. pletion of the Work CONTRACTOR shall remove from
<br /> the Site all tools, appliances, construction equipment
<br /> 6.11 Use of Site and Other Areas and machinery, and surplus materials and shall I
<br /> restore to original condition all property not designated
<br /> A. Limitation on Use of Site and OtherAreas for alteration by the Contract Documents.
<br /> I
<br /> 1. CONTRACTOR shall confine D. Loading Structures: CONTRACTOR shall not
<br /> construction equipment, the storage of load nor permit any part of any structure to be loaded
<br /> materials and equipment, and the operations of in any manner that will endanger the structure, nor
<br /> workers to the Site and other areas permitted shall CONTRACTOR subject any part of the Work or
<br /> by Laws and Regulations, and shall not adjacent property to stresses or pressures that will
<br /> unreasonably encumber the Site and other endanger it.
<br /> areas with construction equipment or other
<br /> materials or equipment. CONTRACTOR shall 6.12 Record Documents
<br /> assume full responsibility for any damage to
<br /> any such land or area, or to the owner or A. CONTRACTOR shall maintain in a safe place
<br /> occupant thereof, or of any adjacent land or at the Site one record copy of all Drawings, Specifica-
<br /> areas resulting from the performance of the tions, Addenda, Written Amendments, Change
<br /> Work. Orders, Work Change Directives, Field Orders, and
<br /> written interpretations and clarifications in good order
<br /> 2. Should any claim be made by any and annotated to show changes made during
<br /> such owner or occupant because of the construction. These record documents together with
<br /> performance of the Work, CONTRACTOR shall all approved Samples and a counterpart of all i
<br /> promptly settle with such other party by approved Shop Drawings will be available to ENGI-
<br /> negotiation or otherwise resolve the claim by NEER for reference. Upon completion of the Work,
<br /> arbitration or other dispute resolution these record documents, Samples, and Shop
<br /> proceeding or at law. Drawings will be delivered to ENGINEER for OWNER.
<br /> 3. To the fullest extent permitted by 6.13 Safety and Protection
<br /> Laws and Regulations, CONTRACTOR shall
<br /> indemnify and hold harmless OWNER, A. CONTRACTOR shall be solely responsible j
<br /> ENGINEER, ENGINEER's Consultant, and the for initiating, maintaining and supervising all safety
<br /> officers, directors, partners, employees, agents, precautions and programs in connection with the
<br /> and other consultants of each and any of them Work. CONTRACTOR shall take all necessary
<br /> from and against all claims, costs, losses, and precautions for the safety of, and shall provide the
<br /> damages (including but not limited to all fees necessary protection to prevent damage, injury or loss
<br /> and charges of engineers, architects, attorneys, to:
<br /> and other professionals and all court or
<br /> arbitration or other dispute resolution costs) 1. all persons on the Site or who may
<br /> arising out of or relating to any claim or action, be affected by the Work;
<br /> legal or equitable, brought by any such owner
<br /> 00700-General Conditions REV 5-10-13
<br /> 00700-23
<br /> F•\Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr WesAAdmimWd documents\Master Contract Documents\00700-
<br /> General Conditions REV 5-10-13.doc