2. all the Work and materials and equip- 6.15 Hazard Communication Programs
<br /> ment to be incorporated therein, whether in
<br /> storage on or off the Site;and A. CONTRACTOR shall be responsible for
<br /> coordinating any exchange of material safety data
<br /> 3. other property at the Site or adjacent sheets or other hazard communication information
<br /> thereto, including trees, shrubs, lawns, walks, required to be made available to or exchanged be-
<br /> pavements, roadways, structures, utilities, and tween or among employers at the Site in accordance
<br /> Underground Facilities not designated for with Laws or Regulations.
<br /> removal, relocation, or replacement in the
<br /> course of construction. 6.16 Emergencies
<br /> B. CONTRACTOR shall comply with all applica- A. In emergencies affecting the safety or protec-
<br /> ble Laws and Regulations relating to the safety of tion of persons or the Work or property at the Site or
<br /> persons or property, or to the protection of persons or adjacent thereto, CONTRACTOR is obligated to act to
<br /> property from damage, injury, or loss; and shall erect prevent threatened damage, injury, or loss.
<br /> and maintain all necessary safeguards for such safety CONTRACTOR shall give ENGINEER prompt written
<br /> and protection. CONTRACTOR shall notify owners of notice if CONTRACTOR believes that any significant
<br /> adjacent property and of Underground Facilities and changes in the Work or variations from the Contract
<br /> other utility owners when prosecution of the Work may Documents have been caused thereby or are required
<br /> affect them, and shall cooperate with them in the as a result thereof. If ENGINEER determines that a
<br /> protection, removal, relocation, and replacement of change in the Contract Documents is required be-
<br /> their property. All damage, injury, or loss to any cause of the action taken by CONTRACTOR in
<br /> property referred to in paragraph 6.13.A.2 or 6.13.A.3 response to such an emergency, a Work Change
<br /> caused, directly, or indirectly, in whole or in part, by Directive or Change Order will be issued.
<br /> CONTRACTOR, any Subcontractor, Supplier, or any
<br /> other individual or entity directly or indirectly employed 6.17 Shop Drawings and Samples
<br /> by any of them to perform any of the Work, or anyone
<br /> for whose acts any of them may be liable, shall be A. CONTRACTOR shall submit Shop Drawings
<br /> remedied by CONTRACTOR (except damage or loss to ENGINEER for review and approval in accordance
<br /> attributable to the fault of Drawings or Specifications with the acceptable schedule of Shop Drawings and
<br /> or to the acts or omissions of OWNER or ENGINEER Sample submittals. All submittals will be identified as
<br /> or ENGINEER's Consultant, or anyone employed by ENGINEER may require and in the number of copies
<br /> any of them, or anyone for whose acts any of them specified in the General Requirements. The data
<br /> may be liable, and not attributable, directly or shown on. the Shop Drawings will be complete with
<br /> indirectly, in whole or in part, to the fault or negligence respect to quantities, dimensions, specified perfor-
<br /> of CONTRACTOR or any Subcontractor, Supplier, or mance and design criteria, materials, and similar data
<br /> other individual or entity directly or indirectly employed to show ENGINEER the services, materials, and
<br /> by any of them). CONTRACTOR's duties and equipment CONTRACTOR proposes to provide and
<br /> responsibilities for safety and for protection of the to enable ENGINEER to review the information for the
<br /> Work shall continue until such time as all the Work is limited purposes required by paragraph 6.17.E.
<br /> completed and ENGINEER has issued a notice to
<br /> OWNER and CONTRACTOR in accordance with B. CONTRACTOR shall also submit Samples to
<br /> paragraph 14.07.13 that the Work is acceptable ENGINEER for review and approval in accordance
<br /> (except as otherwise expressly provided in connection with the acceptable schedule of Shop Drawings and
<br /> with Substantial Completion). Sample submittals. Each Sample will be identified
<br /> clearly as to material, Supplier, pertinent data such as
<br /> 6.14 Safety Representative catalog numbers, and the use for which intended and
<br /> otherwise as ENGINEER may require to enable ENGI-
<br /> A. CONTRACTOR shall designate a qualified NEER to review the submittal for the limited purposes
<br /> and experienced safety representative at the Site required by paragraph 6.17.E. The numbers of each
<br /> whose duties and responsibilities shall be the Sample to be submitted will be as specified in the
<br /> prevention of accidents and the maintaining and Specifications.
<br /> supervising of safety precautions and programs.
<br /> C. Where a Shop Drawing or Sample is required
<br /> by the Contract Documents or the schedule of Shop
<br /> Drawings and Sample submittals acceptable to ENGI-
<br /> NEER as required by paragraph 2.07, any related
<br /> 00700-General Conditions REV 5-10-13
<br /> 00700-24