My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> inspections or tests revise or revoke an such ENGINEER OWNER must give <br /> P � Y <br /> payment recommendation previously made, to CONTRACTOR immediate written notice (with <br /> such extent as may be necessary in a copy to ENGINEER) stating the reasons for <br /> ENGINEER's opinion to protect OWNER from such action and promptly pay CONTRACTOR <br /> loss because: any amount remaining after deduction of the <br /> amount so withheld. OWNER shall promptly �l <br /> a. the Work is defective, or completed pay CONTRACTOR the amount so withheld, or <br /> Work has been damaged, requiring any adjustment thereto agreed to by OWNER <br /> correction or replacement; and CONTRACTOR, when CONTRACTOR <br /> corrects to OWNER's satisfaction the reasons <br /> b. the Contract Price has been reduced for such action. <br /> by Written Amendment or Change Orders; <br /> 3. If it is subsequently determined that <br /> c. OWNER has been required to correct OWNER's refusal of payment was not justified, f <br /> defective Work or complete Work in accor- the amount wrongfully withheld shall be treated <br /> dance with paragraph 13.09;or as an amount due as determined by paragraph <br /> 14.02.C.1. <br /> d. ENGINEER has aGtual knewledge of <br /> the GGGUrrenGe of any of the events nnurner- 14.03 CONTRACTOR's Warranty of Title <br /> a . <br /> A. CONTRACTOR warrants and guarantees <br /> C. Payment Becomes Due that title to all Work, materials, and equipment covered <br /> by any Application for Payment, whether incorporated <br /> 1 Ten days after nresentatinn of the in the Project or not,will pass to OWNER no later than <br /> AppNsation-fer Payment to QWNER v.rith the time of payment free and clear of all Liens. <br /> €A'GINE€R'sreGGFrimendatieR, the arnewRt <br /> Fe(39m eery 14.04 Substantial Completion <br /> paragraph 14.020) beGOFne , <br /> and when <br /> due.fill be paid by OWNER to�'nnf`'T <br /> ITRAQR A. When CONTRACTOR considers the entire <br /> v Work ready for its intended use CONTRACTOR shall <br /> D. Reduction in Payment notify OWNER and ENGINEER in writing that the <br /> entire Work is substantially complete(except for items <br /> 1. OWNER may refuse to make specifically listed by CONTRACTOR as incomplete) <br /> payment of the full amount recommended by and request that ENGINEER issue a certificate of <br /> ENGINEER because: Substantial Completion. Promptly thereafter, <br /> OWNER, CONTRACTOR, and ENGINEER shall <br /> a. claims have been made against make an inspection of the Work to determine the <br /> OWNER on account of CONTRACTOR's status of completion. If ENGINEER does not consider <br /> performance or furnishing of the Work; the Work substantially complete, ENGINEER will <br /> notify CONTRACTOR in writing giving the reasons <br /> b. Liens have been filed in connection therefore. if ENGINEER GE)Rsiders the ).Ata <br /> with the Work, except where substantially-Gemplete, ENGINEERwill prepare and j <br /> CONTRACTOR has delivered a specific deliveF to OWNER a tentatiVe GeFtifiGate of SubstaRtia_l I <br /> Bond satisfactory to OWNER to secure the Gempletion whiGh shall fix the-date-ef S;bstaatial I <br /> satisfaction and discharge of such Liens; Gernpletien. There shall be ^*^^hed to the Gertiftsate <br /> a tentative list of items to be Gerripleted Gr E;erFeGted <br /> c. there are other items entitling OWN- befe,Fe final payment. OWNER shall e seven days <br /> ER to a set-off against the amount after FeGeipt of the tentative Ge;tif Gate during ,hiGh to <br /> recommended; or make written c�bjesti9; zG ENGINEER as te-any <br /> p;evis,e,s of the Gertifisate er attas#�ed Inst. I#-after <br /> d. OWNER has actual knowledge of the ^^nsideFin^ -c ENGINEER RGl de � <br /> occurrence of any of the events enumerated that the Aheirk is not—substantially—GOMplete <br /> in paragraphs 14.02.B.5.a through ENGINEER will within 14 d,, - I issiE)R of the <br /> 14 02.B.5.c or paragraph 15.02.A. <br /> rn writing, stating the Feasens therefer. if, a€ter <br /> 2. If OWNER refuses to make payment Gensideratiera-ef OWNER's bjeGto^s, €PIG;-NEER <br /> of the full amount recommended by Geflsiders the WaFk substantially—GOmplete, <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-40 <br /> F%Public WorkstENGINEERING DIVISION PROJECTS11123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr West\Admim\bid documents\Master Contract Documenls100700- <br /> General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.