My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEER ,.,in ,,; iR said 14 ys exeGHte and tially complete and request ENGINEER to issue <br /> a certificate of Substantial Completion for that <br /> Gertifioate of t+al� tiGn 10vith a Fevised part of the Work. Within a reasonable time <br /> tentative—list of items to h mpleted OF GGFFBGted) after either such request, OWNER, <br /> ,.ting such GhaRges from th�te4#ative.-sertt#� CONTRACTOR, and ENGINEER shall make <br /> as ENGINEER believes justified after noncideration o an inspection of that part of the Work to <br /> any ebjestions from OWNER. At the time of delivee¢ determine its status of completion. If <br /> of the tentative GertiF to of c„hsta eR}pletieR ENGINEER does not consider that part of the <br /> ENG," WEER ,yill deliver to (Q) lE Work to be substantially complete, ENGINEER <br /> Top a written reGorn vision—o will notify OWNER and CONTRACTOR in <br /> responsibilities—peRdiRg final—payment—between writing giving the reasons therefor. If <br /> OWNER and CONTRACTOR with FespeGt tO , ENGINEER considers that part of the Work to <br /> Gperation,safer —and—pFE)test Gnof the WGT4, be substantially complete, the provisions of <br /> maiiRtenanse,, beat, n <br /> utilitie , is�suranGe, and waFFantie paragraph 14.04 will apply with respect to <br /> ;ani—guaFaRtees. toss OWNER and certification of Substantial Completion of that <br /> nSO,TRACTO agree—ether Mise in writing and sq part of the Work and the division of <br /> ;nform ENGINEER On vKi ing p Gr to En GINEER's responsibility in respect thereof and access <br /> 4—,suing the definitive s thereto. <br /> tiee,ENGINEER's aforesaid r endatiG4i-w&� <br /> 2. No occupancy or separate operation <br /> paymeR of part of the Work may occur prior to <br /> compliance with the requirements of paragraph <br /> B. OWNER shall have the right to exclude 5.10 regarding property insurance. <br /> CONTRACTOR from the Site after the date of <br /> Substantial Completion, but OWNER shall allow CON- 14.06 Final Inspection <br /> TRACTOR reasonable access to complete or correct <br /> items on the tentative list. A. Upon written notice from CONTRACTOR that <br /> the entire Work or an agreed portion thereof is <br /> 14.05 Partial Utilization complete, ENGINEER will promptly make a final <br /> inspection with OWNER and CONTRACTOR and will <br /> A. Use by OWNER at OWNER's option of any notify CONTRACTOR in writing of all particulars in <br /> substantially completed part of the Work which has which this inspection reveals that the Work is <br /> specifically been identified in the Contract Documents, incomplete or defective. CONTRACTOR shall <br /> or which OWNER, ENGINEER, and CONTRACTOR immediately take such measures as are necessary to <br /> agree constitutes a separately functioning and usable complete such Work or remedy such deficiencies. <br /> part of the Work that can be used by OWNER for its <br /> intended purpose without significant interference with 14.07 Final Payment <br /> CONTRACTOR's performance of the remainder of <br /> the Work, may be accomplished prior to Substantial A. Application for Payment <br /> Completion of all the Work subject to the following <br /> conditions. 1. After CONTRACTOR has, in the <br /> opinion of ENGINEER, satisfactorily completed <br /> 1. OWNER at any time may request all corrections identified during the final <br /> CONTRACTOR in writing to permit OWNER to inspection and has delivered, in accordance <br /> use any such part of the Work which OWNER with the Contract Documents, all maintenance <br /> believes to be ready for its intended use and and operating instructions, schedules, guaran- <br /> substantially complete If CONTRACTOR tees, Bonds, certificates or other evidence of <br /> agrees that such part of the Work is insurance certificates of inspection, marked-up <br /> substantially complete, CONTRACTOR will record documents (as provided in paragraph <br /> certify to OWNER and ENGINEER that such 6.12), and other documents, CONTRACTOR <br /> part of the Work is substantially complete and may make application for final payment follow- <br /> request ENGINEER to issue a certificate of ing the procedure for progress payments. <br /> Substantial Completion for that part of the <br /> Work. CONTRACTOR at any time may notify 2. The final Application for Payment <br /> OWNER and ENGINEER in writing that shall be accompanied (except as previously <br /> CONTRACTOR considers any such part of the delivered) by: (i) all documentation called for in <br /> Work ready for its intended use and substan- the Contract Documents, including but not <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-41 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Or West\Admim\bid documents\Masler Contract Documents\00700- <br /> General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.