My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> limited to the evidence of insurance required by assompaa-ying--desunae Ttatien, the amount <br /> subparagraph 5.04 B.7; (ii) consent of the reGGIMmended by ENGINEER will beseme due <br /> surety, if any, to final payment; and (iii) and-when due, will be paid 'Dy QWNER to <br /> complete and legally effective releases or CONTRACT <br /> waivers (satisfactory to OWNER) of all Lien <br /> rights arising out of or Liens filed in connection 14.08 Final Completion Delayed <br /> with the Work. <br /> A. If, through no fault of CONTRACTOR, final <br /> 3. In lieu of the releases or waivers of completion of the Work is significantly delayed, and if <br /> Liens specified in paragraph 14.07.A.2 and as ENGINEER so confirms, OWNER shall, upon receipt <br /> approved by OWNER, CONTRACTOR may of CONTRACTOR's final Application for Payment and <br /> furnish receipts or releases in full and an recommendation of ENGINEER, and without terminat- <br /> affidavit of CONTRACTOR that: (i)the releases ing the Agreement, make payment of the balance due <br /> and receipts include all labor, services, for that portion of the Work fully .completed and <br /> material, and equipment for which a Lien could accepted. If the remaining balance to be held by <br /> be filed; and (ii) all payrolls, material and OWNER for Work not fully completed or corrected is <br /> equipment bills, and other indebtedness less than the retainage stipulated in the Agreement, <br /> connected with the Work for which OWNER or and if Bonds have been furnished as required in <br /> OWNER's property might in any way be paragraph 5.01, the written consent of the surety to <br /> responsible have been paid or otherwise satis- the payment of the balance due for that portion of the <br /> fled. If any Subcontractor or Supplier fails to Work fully completed and accepted shall be submitted <br /> furnish such a release or receipt in full, CON- by CONTRACTOR to ENGINEER with the Application <br /> TRACTOR may furnish a Bond or other for such payment. Such payment shall be made ! <br /> collateral satisfactory to OWNER to indemnify under the terms and conditions governing final <br /> OWNER against any Lien. payment, except that it shall not constitute a waiver of <br /> Claims. <br /> B. Review of Application and Acceptance <br /> 14.09 Waiver of Claims <br /> 1. If, on the basis of ENGINEER's <br /> observation of the Work during construction A. The making and acceptance of final payment <br /> and final inspection, and ENGINEER's review will constitute: <br /> of the final Application for Payment and <br /> accompanying documentation as required by 1. a waiver of all Claims by OWNER <br /> the Contract Documents, ENGINEER is against CONTRACTOR, except Claims arising <br /> satisfied that the Work has been completed from unsettled Liens, from defective Work <br /> and CONTRACTOR's other obligations under appearing after final inspection pursuant to <br /> the Contract Documents have been fulfilled, paragraph 14.06, from failure to comply with the <br /> ENGINEER will, within ten.days after receipt of Contract Documents or the terms of any special <br /> the final Application for Payment, indicate in guarantees specified therein, or from <br /> writing ENGINEER's recommendation of CONTRACTOR's continuing obligations under <br /> payment and present the Application for the Contract Documents;and <br /> Payment to OWNER for payment. At the same <br /> time ENGINEER will also give written notice to 2. a waiver of all Claims by CONTRAC- <br /> OWNER and CONTRACTOR that the Work is TOR against OWNER other than those <br /> acceptable subject to the provisions of previously made in writing which are still <br /> paragraph 14.09. Otherwise, ENGINEER will unsettled. <br /> return the Application for Payment to <br /> CONTRACTOR, indicating in writing the <br /> reasons for refusing to recommend final ARTICLE 15-SUSPENSION OF WORK AND <br /> payment, in which case CONTRACTOR shall TERMINATION <br /> make the necessary corrections and resubmit <br /> the Application for Payment. <br /> 15.01 OWNER May Suspend Work <br /> C. Payment Becomes Due <br /> A. At any time and without cause, OWNER may <br /> 1. Thirtydaysafter-the-preseRtatisa-te suspend the Work or any portion thereof for a period <br /> OWNER of the AppliGatiGR for Payment and of not more than 90 consecutive days by notice in <br /> 00700-General Conditions REV 510-13 <br /> 00700-42 <br /> F"\Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk improvements 26th St.to Airport Dr WP0Admim\bid documents\Master Contract Documents10070D- <br /> General Conditions REV 5-10.13.doc <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.