Laserfiche WebLink
writing to CONTRACTOR and ENGINEER which will will be paid to CONTRACTOR. If such claims, costs, <br /> fix the date on which Work will be resumed. CON- losses, and damages exceed such unpaid balance, <br /> TRACTOR shall resume the Work on the date so CONTRACTOR shall pay the difference to OWNER. <br /> fixed. GONTRAGTOR shall be allGwed @R adjustm Such claims, costs, losses, and damages incurred by <br /> st OWNER will be reviewed by ENGINEER as to their <br /> Times, 6r beth, direGtly attributable te any s reasonableness and, when so approved by <br /> cusp im+a,,,m;e,efbF ENGINEER, incorporated in a Change Order. When <br /> as-provided in paragraph 10.05. exercising any rights or remedies under this <br /> paragraph OWNER shall not be required to obtain the <br /> 15.02 OWNER May Terminate for Cause lowest price for the Work performed. <br /> A. The occurrence of any one or more of the C. Where CONTRACTOR's services have been <br /> following events will justify termination for cause: so terminated by OWNER, the termination will not <br /> affect any rights or remedies of OWNER against <br /> 1. CONTRACTOR's persistent failure CONTRACTOR then existing or which may thereafter <br /> to perform the Work in accordance with the accrue. Any retention or payment of moneys due <br /> Contract Documents (including, but not limited CONTRACTOR by OWNER will not release CON- <br /> to, failure to supply sufficient skilled workers or TRACTOR from liability. <br /> suitable materials or equipment or failure to <br /> adhere to the progress schedule established 15.03 OWNER May Terminate For Convenience <br /> under paragraph 2.07 as adjusted from time to <br /> time pursuant to paragraph 6.04); A. Upon seven days written notice to CON- <br /> TRACTOR and ENGINEER, OWNER may, without <br /> 2. CONTRACTOR's disregard of Laws cause and without prejudice to any other right or <br /> or Regulations of any public body having remedy of OWNER, elect to terminate the Contract. <br /> jurisdiction; In such case, CONTRACTOR shall be paid (without <br /> duplication of any items): <br /> 3. CONTRACTOR's disregard of the <br /> authority of ENGINEER;or 1. for completed and acceptable Work <br /> executed in accordance with the Contract <br /> 4. CONTRACTOR's violation in any Documents prior to the effective date of <br /> substantial way of any provisions of the termination, including fair and reasonable sums <br /> Contract Documents. for overhead and profit on such Work; <br /> B. if one or more of the events identified in 2. for expenses sustained prior to the <br /> paragraph 15.02.A occur, OWNER may, after giving effective date of termination in performing <br /> CONTRACTOR (and the surety, if any) seven days services and furnishing labor, materials, or <br /> written notice, terminate the services of equipment as required by the Contract <br /> CONTRACTOR, exclude CONTRACTOR from the Documents in connection with uncompleted <br /> Site, and take possession of the Work and of all Work, plus fair and reasonable sums for <br /> CONTRACTOR's tools, appliances, construction overhead and profit on such expenses; <br /> equipment, and machinery at the Site, and use the <br /> same to the full extent they could be used by 3. for all claims, costs, losses, and <br /> CONTRACTOR(without liability to CONTRACTOR for damages (including but not limited to all fees <br /> trespass or conversion), incorporate in the Work all and charges of engineers, architects, attorneys, <br /> materials and equipment stored at the Site or for and other professionals and all court or <br /> which OWNER has paid CONTRACTOR but which arbitration or other dispute resolution costs) in- <br /> are stored elsewhere, and finish the Work as OWNER curred in settlement of terminated contracts <br /> may deem expedient. In such case, CONTRACTOR with Subcontractors, Suppliers, and others;and <br /> shall not be entitled to receive any further payment <br /> until the Work is finished. If the unpaid balance of the 4. for reasonable expenses directly <br /> Contract Price exceeds all claims, costs, losses, and attributable to termination. <br /> damages (including but not limited to all fees and <br /> charges of engineers,.architects, attorneys, and other B. CONTRACTOR shall not be paid on account <br /> professionals and all court or arbitration or other of loss of anticipated profits or revenue or other eco- <br /> dispute resolution costs)sustained by OWNER arising nomic loss arising out of or resulting from such <br /> out of or relating to completing the Work, such excess termination. <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-43 <br /> RxPublic Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr West%dmim\bid documents\Master Contract Documents\DD70D- <br /> General Conditions REV 5-10-13.doc <br />