Laserfiche WebLink
i <br /> SECTION 01024 <br /> FORCE ACCOUNT <br /> 1.1 General <br /> CONTRACTOR shall furnish all labor, materials, equipment and incidentals <br /> necessary to perform additional work not covered on the Contract Drawings. <br /> The force Account is intended as a contingency for unforeseen work. <br /> 1.1 PAYMENT <br /> A. Lump sum amount for force account work is included in the bid schedule. <br /> The value of force account work will be determined in accordance with Article <br /> 12 of the General Conditions. <br /> i <br /> a <br /> + + END OF SECTION + + <br /> i <br /> i <br /> i <br /> 01024— 1 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr <br /> West\Admim\bid documents\Master Contract Documents\01024-Force Account.doc <br />