Laserfiche WebLink
SECTION 01050 <br /> FIELD ENGINEERING AND LAYOUT <br /> 1.1 GENERAL <br /> A. The CONTRACTOR will furnish all construction staking for the project. All staking <br /> from control will be under the supervision of a Florida Registered Land Surveyor. <br /> B. Develop and make all detail surveys and measurements needed for construction <br /> including but not limited to, slope stakes, batter boards, piling layouts and all other <br /> working lines, elevations and cut sheets. <br /> C. Keep a transit and leveling instrument on the site at all times and a skilled <br /> instrument man available whenever necessary for layout of the Work. <br /> D. Provide all material required for benchmarks, control points, batter boards, grade <br /> stakes, and other items. <br /> E. Be solely responsible for all locations, dimensions and levels. No data other than <br /> written orders of the ENGINEER shall justify departure from the dimensions and <br /> levels required by the Drawings. <br /> F. Safeguard all points, stakes, grademarks, monuments and benchmarks made or <br /> established on the Work, and reestablish same, if disturbed. Rectify all Work <br /> improperly installed because of not maintaining, not protecting or removing without <br /> authorization such established points, stakes, marks and monuments. <br /> G. When requested by the ENGINEER, provide such facilities and assistance as may <br /> be necessary for the ENGINEER to check line and grade points placed by the <br /> CONTRACTOR. Do no excavation or embankment work until all cross-sectioning <br /> necessary for determining pay quantities has been completed and checked by the <br /> ENGINEER. <br /> H. The cost of performing engineering and layout work described above shall be <br /> included in the contract unit prices for the various items of work to which it is <br /> incidental. No separate payment will be made for surveying or engineering. <br /> 1.2 SURVEY WORK AND QUALIFICATIONS OF SURVEYOR , <br /> A. Prior to commencing work, the CONTRACTOR shall satisfy himself as to the <br /> accuracy of all survey and existing site information as indicated in the Contract <br /> Documents. Immediately notify the ENGINEER upon discovery of any errors, <br /> inaccuracies or omissions in the survey data. The commencing of any of the work <br /> by the CONTRACTOR shall be held as the CONTRACTOR's acceptance that all <br /> survey or existing site information is correct and accurate,without any reasonably <br /> inferable errors, inaccuracies or omissions. <br /> 1050-1 01050 Field Engineering <br /> F 1Public WorkstENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr WesMdmim\bid documents\Master Contract <br /> DocumentsN01050-Field Engineering.doc <br />