Laserfiche WebLink
I <br /> SECTION 01050 <br /> FIELD ENGINEERING AND LAYOUT j <br /> B. The CONTRACTOR shall carefully preserve all control stakes,. benchmarks, <br /> reference points and property corners and will be responsible for any mistake or <br /> loss of time caused by their unnecessary loss or disturbance. If the loss or <br /> disturbance of the stakes or marks cause a delay in the Work,the CONTRACTOR <br /> shall have no claim for damages or extension of time. Control stakes, j <br /> benchmarks, reference points and property corners disturbed by the <br /> CONTRACTOR's work shall be replaced by a Florida Registered Land Surveyor <br /> and Mapper, at the CONTRACTOR's expense. In the event the Owner must <br /> provide the services of the Florida Registered Surveyor and Mapper to perform <br /> this replacement work,the cost of the surveying services will be deducted from any <br /> sums due the CONTRACTOR for the work performed under this Contract. <br /> C. All survey work shall be performed under the guidance and direction of a Florida <br /> Registered Surveyor and Mapper. <br /> D. All survey work for Record Drawings shall be performed by la Florida Registered <br /> Surveyor and Mapper. <br /> 1_3 STATION BOARDS <br /> A. CONTRACTOR shall erect and maintain white/black standard FDOT station <br /> markers every 100 feet. <br /> 1.4 LAYOUT OF STRIPING <br /> Establish by instrument, and mark the finished surface, the points necessary for <br /> striping finished roadway in conformance with Section 5-7 of FDOT Standard <br /> Specifications. <br /> + + END OF SECTION + + <br /> 1050-2 01050 Field Engineering <br /> RkPublic WorksIENGINEERING DIVISION PROJECTS11123 43rd Ave Sidewalk Improvements 26th St to Airport Dr WestVldmim\bid documentslMaster Contract <br /> Documents101050-Feld Engineering.doc <br />