Laserfiche WebLink
i I <br /> i <br /> ACCURACY <br /> The CONTRACTOR will be held responsible for the accuracy and completeness of <br /> Record Drawings and Electronic As-Builts and shall bear any costs incurred in finding <br /> utilities as a result of incorrect data furnished by the CONTRACTOR. <br /> i <br /> COMPLETION OF WORK <br /> Upon Substantial Completion of the Work, deliver Record Drawings/As-Built Drawings <br /> to ENGINEER. Final payment will not be made until satisfactory record documents are <br /> received and approved by ENGINEER. <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No. 101-1 - Mobilization — Per Lump Sum <br /> [The remainder of this page was left blank intentionally] <br /> i <br /> I <br /> I <br /> 01025-6 <br /> Technical Specifications <br /> P\Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr <br /> West\Admim\bid documents\Master Contract Documents\Technical Specifications.doc <br />