My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 104 - PREVENTION CONTROL AND ABATEMENT OF EROSION AND <br /> WATER POLLUTION <br /> The work specified in this item shall conform to Section 104 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction with the following <br /> modifications. <br /> PART 1 — GENERAL <br /> 1.1 SCOPE <br /> A. This Section covers erosion control and the treatment of dewatering water and <br /> stormwater runoff from the construction site and work area. Pollution control measures <br /> shall prevent polluted or turbid waters from being discharged from the construction site <br /> or work area to undeveloped portions of the site or offsite, including but not limited to <br /> Multiple Separate Storm Sewer Systems (MS4s) and Waters of the State. <br /> B. The OWNER considers pollution from dewatering water and stormwater runoff from a <br /> construction site or work area to be a very serious offense. The CONTRACTOR is <br /> solely responsible for preventing pollution caused by dewatering water and stormwater <br /> runoff from the construction site or work area. Note that state regulations do not allow <br /> mixing stormwater and dewatering groundwater in the same release = separate and <br /> independent discharges are required. <br /> C. Pollution control measures specified herein represent minimum standards to be <br /> adhered to by the CONTRACTOR throughout the Project's construction. The OWNER <br /> reserves the right to require the CONTRACTOR to employ additional pollution control <br /> measures, when in the sole opinion of the OWNER,they are warranted. If site specific <br /> conditions require additional erosion and stormwater pollution control measures during <br /> any phase of construction or operation to prevent erosion or to control sediment or <br /> other pollution, beyond those specified in the Drawings, the Project's approved <br /> Stormwater Pollution Prevention Plan (SWPPP), or herein, implement additional best <br /> management practices .as necessary, in accordance with Chapter 4, "Best <br /> Management Practices for Erosion and Sedimentation Control"of the Florida Erosion <br /> and Sediment Control Inspector's Manual and other references as may be applicable <br /> or required by regulatory permits. <br /> D. The OWNER may terminate this Contract if the CONTRACTOR fails to comply with <br /> this Section. Alternatively,the OWNER may halt the CONTRACTOR's operations until <br /> the CONTRACTOR is in full compliance with this Section. If the OWNER halts the <br /> CONTRACTOR's Work as a result of failure to comply with this Section, the Contract <br /> time clock will continue to run. <br /> E. In addition to these Specifications, comply with Chapter 4 - "Best Management <br /> Practices for Erosion and Sedimentation Control"and Chapter 5—"Best Management <br /> Practices for Dewatering" of the Florida Erosion and Sediment Control Inspector's <br /> Manual. In the event of a conflict between the referenced chapters and these <br /> Specifications, the more stringent requirement shall prevail. <br /> 01025-12 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr West\Admim\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.