My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> F. Submit to SJRWMD a "Notice to District of Dewatering Activity" (SJRWMD Form No. <br /> 40C-2.900(12)) prior to commencement of dewatering in accordance with F.A.C.40C- <br /> 2.042(9). Provide a copy of the Notice to Indian River County. <br /> 1.2 PERMITS <br /> A. The OWNER has obtained certain permits for this project and they are listed in <br /> paragraph 6.08.13 of the EJCDC Standard General Conditions of the Construction <br /> Contract(General Conditions). Per paragraph 6.08.0 of the General Conditions, apply <br /> for and obtain all other required federal, state, and local permits, licenses, sampling, <br /> and tests. <br /> B. Provide copies of all approved permits to the OWNER and ENGINEER and comply <br /> with all conditions contained in all permits at no extra cost to the OWNER. If there is a <br /> conflict between any permit requirement and these Specifications or requirements <br /> between permits, the more stringent specification or requirement shall govern. <br /> C. Pay for all required water quality sampling and laboratory tests. <br /> i <br /> 1.3 GENERAL <br /> A. Do not begin any other construction work until the pollution control and treatment <br /> system has been constructed in accordance with approved plans, permits, and these <br /> Specifications; and the installed system has been examined by the OWNER for <br /> compliance. <br /> B. From time to time, the OWNER or ENGINEER will inspect the pollution control and <br /> treatment system and may take effluent samples for analysis by a testing laboratory <br /> selected and paid for by the OWNER. If at any time, the OWNER or ENGINEER <br /> determines that the pollution control and treatment system is not in compliance with <br /> the approved system, the OWNER or ENGINEER will shut the portion of the project <br /> down that is not in compliance, and it shall remain shut-down until the pollution control <br /> and treatment system is properly constructed or repaired, and complies with the <br /> approved pollution control and- treatment system plans, specifications, contract <br /> documents, and permits. <br /> C. Schedule construction to minimize erosion and stormwater runofffrom the construction <br /> site. Implement erosion control measures on disturbed areas as soon as practicable in <br /> portions of the site where construction activities have temporarily or permanently <br /> ceased, but in no case more than 7 days after the construction activity in that portion of <br /> the site has temporarily or permanently ceased. In addition to other temporary erosion <br /> control measures that may be implemented, application of polyacrylamide is required <br /> on all such disturbed areas within 7 days after the construction activity in that portion of <br /> the site has temporarily or permanently ceased, unless final landscaping has been <br /> installed. Polyacrylamide application shall be as specified herein. Include <br /> polyacrylamide application in the Project's SWPPP. <br /> 01025-13 Technical Specifications <br /> FA1Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr West\Admim\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.