Laserfiche WebLink
castings for catch basins, manholes, or other structures shall be carefully removed <br /> and stored in the County's Storage Yard if they are deemed salvageable by the <br /> Engineer. The excavated materials shall be removed from the job site and disposed in <br /> a location designated or approved by the Owner. Any culverts, structures or any <br /> material excavated or removed from the project site under clearing and grubbing <br /> deemed unsalvageable by the Engineer shall be disposed of in a legal manner by the <br /> Contractor. Where required, suitable material as approved by the Engineer shall then <br /> be backfilled and compacted to restore the original contour of the ground. The fill <br /> material shall be backfilled and compacted in accordance with Section 120 of these <br /> specifications. <br /> H. No additional payment will be made, nor will additional work, or change orders be <br /> authorized for work needed to remove, relocate, protect, or otherwise account for in <br /> the construction of the work depicted in the plans, for any feature, or item that would <br /> be apparent from a careful inspection of the site and review of the plans, even though <br /> such feature or item is not specifically called out in the plans. It is therefore essential <br /> the contractor make such inspection and review. <br /> I. The unit price bid for this item shall include the cost of all labor, tools, and equipment <br /> necessary to excavate, remove, and dispose of those items as directed by the <br /> Engineer and where designated on the Drawings. The cost of restoration and backfill <br /> and compaction for the specific area of removal shall also be included under this item. <br /> I <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No. 110-1-1 - Clearing and Grubbing — Per Lump Sum <br /> i <br /> EARTHWORK AND RELATED OPERATIONS FOR LAP (OFF-SYSTEM). <br /> (REV 1-23-12)(FA 2-27-12) <br /> SECTION 120 <br /> EARTHWORK AND RELATED OPERATIONS FOR LAP(OFF-SYSTEM) <br /> 120-1 Description. <br /> 120-1.1 General: Perform earthwork and related operations based on the type of work <br /> specified in the Contract and the Earthwork Categories as defined below. Meet the applicable <br /> requirements for materials, equipment and construction as specified. Earthwork and related <br /> operations consists of excavation for the construction of the roadway, excavation for <br /> structures and pipe, constructing backfill around structures and pipe, and constructing <br /> embankments as required for the roadway, ditches, and channel changes. <br /> 120-1.2 Earthwork Categories: Performance of.Earthwork Operations will fall into one <br /> of the following Earthwork Categories: <br /> 120-1.2.1 Earthwork Category 1: Includes the earthwork and related <br /> operations associated with the construction of sidewalks and bike paths along with any <br /> drainage structures associated with these facilities. <br /> 01025-23 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr West\Admim\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br />