My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 120-1.2.2 Earthwork Category 2: Includes the earthwork and related <br /> operations associated with the construction of turn lanes and other non-mainline traffic lanes, <br /> widening, roadway shoulders, concrete box culverts,- retaining walls, and other drainage <br /> structures on the non-mainline pavement. <br /> 120-1.2.3 Earthwork Category 3: Includes the earthwork and related <br /> operations associated with the construction of new mainline pavement, along with concrete <br /> box culverts, retaining walls, and other drainage structures on the mainline pavement. <br /> 120-2 Classes of Excavation. <br /> 120-2.1 Excavation of Unsuitable Material: Excavation of unsuitable material <br /> consists of the removal of muck, clay, rock or any other material that is unsuitable in its <br /> original position and that is excavated below the finished grading template. For stabilized <br /> bases and sand bituminous road mixes, the finished grading template is the top of the <br /> finished base, shoulders and slopes. For all other bases and rigid pavement, the finished <br /> grading template is the finished shoulder and slope lines and bottom of completed base or <br /> rigid pavement. <br /> 120-2.2 Lateral Ditch Excavation: Lateral ditch excavation consists of all excavation <br /> of inlet and outlet ditches to structures and roadway, changes in channels of streams, and <br /> ditches parallel to the roadway right-of-way. Dress'lateral ditches to the grade and cross- <br /> section shown in the plans. <br /> 120-2.3 Channel Excavation: Channel excavation consists of the excavation and <br /> satisfactory disposal of all materials from the limits of the channel as shown in the plans. <br /> 120-2.4 Excavation for Structures and Pipe: Excavation for structures consists of the <br /> excavation for bridge foundations, box culverts, pipe culverts,storm sewers and all other pipe <br /> lines, retaining walls, headwalls for pipe culverts and drains, catch basins, drop inlets, <br /> manholes, and similar structures. <br /> 120-3 Excavation Requirements. <br /> 120-3.1 Excavation and Replacement of Unsuitable Materials: Where rock, muck, <br /> clay, or other material within the limits of the roadway is unsuitable in its original position, <br /> excavate such material to the cross-sections shown in the plans or indicated by the Engineer, <br /> and backfill with suitable material. Shape backfill materials to the required cross-sections. <br /> Where the removal of plastic soils below the finished earthwork grade is required, meet a <br /> construction tolerance of plus or minus 0.2 foot in depth and plus or minus 6 inches (each <br /> side) in width. <br /> 120-3.2 Lateral Ditch Excavation: Excavate inlet and outlet ditches to structures and <br /> roadway, changes in channels of streams and ditches parallel to the roadway. Dress lateral <br /> ditches to the grade and cross-section shown in the plans. <br /> 120-3.3 Channel Excavation: Excavate and dispose of all materials from the limits of <br /> the channel as shown in the plans. Excavate for bridge foundations, box culverts, pipe <br /> culverts, storm sewers and all other pipe lines, retaining walls, headwalls for pipe culverts and <br /> drains, catch basins, drop inlets, manholes, and similar structures. <br /> 120-3.4 Excavation for Structures and Pipe. <br /> 120-3.4.1 Requirements for all Excavation: Excavate foundation pits to permit <br /> the placing of the full widths and lengths of footings shown in the plans, with full horizontal <br /> beds. Do not round or undercut corners or edges of footings. Perform all excavation to <br /> foundation materials, satisfactory to the Engineer, regardless of the elevation shown on the <br /> plans. Perform all excavation in stream beds to a depth at least 4 feet below the permanent <br /> 01025-24 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr West\Admim\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.