(as provided in 120-6.2.2), compact the top 6 inches (compacted thickness) of such layer to <br /> the density as specified in 120-9.5. <br /> 120-7.2.4 Compaction Where Plastic Material Has Been Removed: Where ' <br /> unsuitable material is removed and the remaining surface is of the A-4, A-5, A-6, or A-7 Soil I <br /> Groups, as determined by the Engineer, compact the surface of the excavated area by rolling <br /> with a sheepsfoot roller exerting a compression of at least 250 psi on the tamper feet, for the <br /> full width of the roadbed (subgrade and shoulders). Perform rolling before beginning any <br /> backfill, and continue until the roller feet do not penetrate the surface more than 1 inch. Do <br /> not perform such rolling where the remaining surface is below the normal water table and I <br /> covered with water. Vary the procedure and equipment required for this operation at the <br /> discretion of the Engineer. <br /> 120-7.2.5 Compaction of Material To Be Used In Base, Pavement, or <br /> Stabilized Areas: Do not compact embankment material which will be incorporated into a <br /> pavement, base course, or stabilized subgrade, to be constructed as a part of the same <br /> Contract. <br /> 120-7.2.6 Compaction ofGrassed ShoulderAreas: Forthe upper6 inch layer j <br /> of all shoulders which are to be grassed, since no specific density is required, compact onlyto <br /> the extent directed. <br /> 120-7.2.7 Compaction of Grassed Embankment Areas: For the outer layer of <br /> all embankments where plant growth will be established,do not compact. Leave this layer in a <br /> loose condition to a minimum depth of 6 inches for the subsequent seeding or planting <br /> operations. <br /> 120-7.3 Compaction of Subgrade: If the plans do not provide for stabilizing, compact <br /> the subgrade in both cuts and fills to the density specified in 120-9.5. For undisturbed soils,do <br /> not apply density requirements where constructing narrowwidening strips or paved shoulders <br /> 5 feet or less in width. Where trenches for widening-strips are not of sufficient width to permit <br /> he use of standard andara compaction equipment, perform compaction using vibratory ropers,trench I <br /> rollers, or other type compaction equipment approved by the Engineer. Maintain the required <br /> density until the base or pavement is placed on the subgrade. <br /> 120-8 Backfilling Around Structures and Pipe. <br /> 120-8.1 Requirements for all Structures: <br /> 120-8-1.1 General: Backfill around structures and pipe in the dry whenever <br /> normal dewatering equipment and methods can accomplish the needed dewatering. <br /> 129-8.1.2 Equipment and Methods: Provide normal dewatering equipment <br /> including, but not limited to, surface pumps, sump pumps, wellpoints and header pipe and <br /> trenching/digging machinery. Provide normal dewatering methods including, but not limited to, <br /> constructing shallow surface drainage trenches/ditches,-using sand blankets,perforated pipe- __ <br /> drains, sumps and siphons. <br /> 120-8.1.3 Backfill Materials: Backfill to the original ground surface or subgrade <br /> surface of openings made for structures, with a sufficient allowance for settlement. The <br /> Engineer may require that the material used for this backfill be obtained from a source entirely <br /> apart from the structure. Do not allow heavy construction equipment to crossover culvert or <br /> storm sewer pipes until placing and compacting backfill material to the finished earthwork <br /> grade or to an elevation at least 4 feet above the crown of the pipe. <br /> i, <br /> I <br /> 01025-29 Technical Specifications <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk improvements 26th St.to Airport Dr WestWdmim\bid <br /> documents\Master Contract Documents\Technical Specirications.doc <br /> �' <br />