My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 120-9 Acceptance Program. <br /> 120-9.1 Density over 105%: When a computed dry density results in a value greater <br /> than 105%of the applicable Proctor maximum dry density,the Engineer will perform a second j <br /> density test within 5 feet. If the second density results in a value greater than 105%, <br /> investigate the compaction methods, examine the applicable Maximum Density and material <br /> description. If necessary, the Engineer will test an additional sample for acceptance in <br /> accordance with AASHTO T 99, Method C. <br /> 120-9.2 Maximum Density Determination:The Engineer will determine the maximum <br /> density and optimum moisture content-by sampling and testing the material in accordance <br /> with the specified test method listed in 120-9.3. i <br /> 120-9.3 Density Testing Requirements: Compliance with the requirements of 120-9.5 <br /> will be determined in accordance FM 1-T 238. The in-place moisture content will be <br /> determined for each density in accordance with FM 5-507(Determination of Moisture Content <br /> by Means of a Calcium Carbide Gas Pressure Moisture Tester), or ASTM D 4643 (Laboratory <br /> Determination of Moisture Content of Granular Soils By Use of a Microwave Oven). <br /> 120-9.4 Soil Classification: The Engineer will perform soil classification tests in <br /> accordance with AASHTO T-88, and classify soils in accordance with AASHTO M-145 <br /> (Standard Specification for Classification of Soils and Soil-Aggregate Mixtures for Highway <br /> Construction Purposes) in order to determine compliance with embankment utilization J <br /> requirements. <br /> i <br /> 120-9.5 Acceptance Criteria- The Engineer will accept a minimum density in <br /> accordance with 120-7.2 with the following exceptions: <br /> 1) embankment constructed by the hydraulic method as specified in 120-6.3; <br /> 2) material placed outside the standard minimum slope as specified in 120- q <br /> 6.2.4; <br /> 3) other areas specifically excluded herein. <br /> 120-9.6 Frequency: The Engineer will conduct sampling and testing at a minimum <br /> frequency listed in the table below. <br /> Test Name Frequency <br /> Maximum Density One per soil type <br /> Density 1 per 500' RDWY Alt Lift <br /> Soil Classification One per Maximum Density <br /> 120-10 Maintenance and Protection of Work. j <br /> While construction is in progress, maintain adequate drainage for the roadbed at all <br /> times. Maintain a shoulder at least 3 feet wide adjacent to all pavement or base construction <br /> in order to provide support for the edges. <br /> Maintain and protect all earthwork construction throughout the life of the Contract, and <br /> take all reasonable precautions to prevent loss of material from the roadway due to the action <br /> of wind or water. Repair any slides, washouts, settlement, subsidence, or other mishap which <br /> may occur prior to final acceptance of the work. Maintain all channels excavated as a part of <br /> the Contract work against natural shoaling or other encroachments to the lines, grades, and <br /> cross-sections shown in the plans, until final acceptance of the project. <br /> 01025-32 Technical Specifications <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr West Admim\bid <br /> documentsWtaster Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.