Laserfiche WebLink
i <br /> 120-9 Acceptance Program. <br /> 120-9.1 Density over 105%: When a computed dry density results in a value greater <br /> than 105%of the applicable Proctor maximum dry density,the Engineer will perform a second j <br /> density test within 5 feet. If the second density results in a value greater than 105%, <br /> investigate the compaction methods, examine the applicable Maximum Density and material <br /> description. If necessary, the Engineer will test an additional sample for acceptance in <br /> accordance with AASHTO T 99, Method C. <br /> 120-9.2 Maximum Density Determination:The Engineer will determine the maximum <br /> density and optimum moisture content-by sampling and testing the material in accordance <br /> with the specified test method listed in 120-9.3. i <br /> 120-9.3 Density Testing Requirements: Compliance with the requirements of 120-9.5 <br /> will be determined in accordance FM 1-T 238. The in-place moisture content will be <br /> determined for each density in accordance with FM 5-507(Determination of Moisture Content <br /> by Means of a Calcium Carbide Gas Pressure Moisture Tester), or ASTM D 4643 (Laboratory <br /> Determination of Moisture Content of Granular Soils By Use of a Microwave Oven). <br /> 120-9.4 Soil Classification: The Engineer will perform soil classification tests in <br /> accordance with AASHTO T-88, and classify soils in accordance with AASHTO M-145 <br /> (Standard Specification for Classification of Soils and Soil-Aggregate Mixtures for Highway <br /> Construction Purposes) in order to determine compliance with embankment utilization J <br /> requirements. <br /> i <br /> 120-9.5 Acceptance Criteria- The Engineer will accept a minimum density in <br /> accordance with 120-7.2 with the following exceptions: <br /> 1) embankment constructed by the hydraulic method as specified in 120-6.3; <br /> 2) material placed outside the standard minimum slope as specified in 120- q <br /> 6.2.4; <br /> 3) other areas specifically excluded herein. <br /> 120-9.6 Frequency: The Engineer will conduct sampling and testing at a minimum <br /> frequency listed in the table below. <br /> Test Name Frequency <br /> Maximum Density One per soil type <br /> Density 1 per 500' RDWY Alt Lift <br /> Soil Classification One per Maximum Density <br /> 120-10 Maintenance and Protection of Work. j <br /> While construction is in progress, maintain adequate drainage for the roadbed at all <br /> times. Maintain a shoulder at least 3 feet wide adjacent to all pavement or base construction <br /> in order to provide support for the edges. <br /> Maintain and protect all earthwork construction throughout the life of the Contract, and <br /> take all reasonable precautions to prevent loss of material from the roadway due to the action <br /> of wind or water. Repair any slides, washouts, settlement, subsidence, or other mishap which <br /> may occur prior to final acceptance of the work. Maintain all channels excavated as a part of <br /> the Contract work against natural shoaling or other encroachments to the lines, grades, and <br /> cross-sections shown in the plans, until final acceptance of the project. <br /> 01025-32 Technical Specifications <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr West Admim\bid <br /> documentsWtaster Contract Documents\Technical Specifications.doc <br />