Laserfiche WebLink
120-11 Construction. <br /> 120-11.1 Construction Tolerances: Shape the surface of the earthwork to conform to <br /> the lines, grades, and cross-sections shown in the plans. In final shaping of the surface of <br /> earthwork, maintain a tolerance of 0.3 foot above or below the plan cross-section with the <br /> following exceptions: <br /> 1. Shape the surface of shoulders to within 0.1 foot of the plan cross-section. <br /> 2. Shape the earthwork to match adjacent pavement, curb, sidewalk, structures, <br /> etc. <br /> 3. Shape the bottom of ditches so that the ditch impounds no water. i <br /> 4. When the work does not include construction of base or pavement, shape <br /> the entire roadbed (shoulder point to shoulder point)to within 0.1 foot above or <br /> below the plan cross-section. <br /> Ensure that the shoulder lines do not vary horizontally more than 0.3 foot from the true lines <br /> shown in the plans. <br /> 120-11.2 Operations Adjacent to Pavement: Carefully dress areas adjacent to j <br /> pavement areas to avoid damage to such pavement. Complete grassing of shoulder areas I <br /> prior to placing the final wearing course. Do not manipulate any embankment material on a <br /> pavement surface. When shoulder dressing is underway adjacent to a pavement lane being <br /> used to maintain traffic, exercise extreme care to avoid interference with the safe movement <br /> of traffic. <br /> i <br /> 120-12 Method of Measurement. <br /> 120-12.1 Excavation: Excavation will be paid for by volume, in cubic yards, calculated <br /> by the method of average end areas, unless the Engineer determines that another method of <br /> calculation will provide a more accurate result. The material will be measured in its original <br /> position by field survey or by photogrammetric means as designated by the Engineer. <br /> Measurement for payment will include the excavation of unsuitable material, lateral ditch ` <br /> excavation, channel excavation, and excavation for structures and pipe. Payment will not be <br /> made for excavation or embankment beyond the limits shown in the plans or authorized by <br /> the Engineer. <br /> 120-12.2 Embankment: Measurement will be made on a loose volume basis, as <br /> measured in trucks or other hauling equipment at the point of dumping on the road. Payment <br /> will not be made for embankment beyond the limits shown in the plans or authorized by the j <br /> Engineer. <br /> 120-13]Basis of Payment. <br /> 120-13.1 General: Prices and payments for the work items included in this Section will <br /> be full compensation for all work described herein, including excavating, dredging, hauling, <br /> placing, and compacting; dressing the surface of the earthwork; and maintaining and <br /> protecting the complete earthwork. <br /> 120-13.2 Excavation: The total quantity of all excavation specified under this Section <br /> will be paid for at the Contract unit price for Excavation. No payment will be made for the <br /> excavation of any materials which are used for purposes other than those shown in the plans <br /> or designated by the Engineer. No payment will be made for materials excavated outside the <br /> lines and grades given by the Engineer, unless specifically authorized by the Engineer. <br /> 120-13.3 Embankment:The total quantity of embankment specified in this Section will <br /> be paid for at the Contract unit price for embankment. No payment will be made for materials <br /> which are used for purposes other than those shown in the plans or designated by the <br /> 01025-33 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr West\Admim\bid <br /> documents\Master Contract Documents\Technical Specifications.doc <br />