My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 334-5.9 Joints. <br /> 334-5.9.1 Transverse Joints: Construct smooth transverse joints, which are <br /> within 3/16 inch of a true longitudinal profile when measured with a 15 foot manual <br /> straightedge meeting the requirements of FDOT Test Method FM 5-509.These requirements <br /> are waived for transverse joints at the beginning and end of the project and at the beginning <br /> and end of bridge structures, if the deficiencies are caused by factors beyond the control of <br /> the Contractor such as no milling requirement, as determined by the Engineer. When <br /> smoothness requirements are waived, construct a reasonably smooth transitional joint. <br /> 334-5.9.2 Longitudinal Joints: For all layers of pavement except the leveling <br /> course, place each layer so that longitudinal construction joints are offset 6 to 12 inches <br /> laterally between successive layers. Do not construct longitudinal joints in the wheel paths. I <br /> The Engineer may waive these requirements where offsetting is not feasible due to the <br /> sequence of construction. j <br /> 334-5.10 Surface Requirements: Construct a smooth pavement with good surface <br /> texture and the proper cross slope. <br /> 334-5.10.1 Texture of the Finished Surface of Paving Layers: Produce a <br /> finished surface of uniform texture and compaction with no pulled, torn, raveled, crushed or <br /> loosened portions and free of segregation, bleeding, flushing, sand streaks, sand spots, or <br /> ripples. Correct any area of the surface that does not meet the foregoing requirements in <br /> accordance with 334-5.10.4. <br /> In areas not defined to be a density testing exception per 334-6.4.1, obtain <br /> for the Engineer, three 6 inch diameter roadway cores at locations visually identified by the <br /> Engineer to be segregated. The Engineer will determine the density of each core in <br /> accordance with FDOT Test Method FM 1-T 166 and calculate the percent Gmm of the <br /> segregated area using the average Gmb of the roadway cores and the representative <br /> PC Gmm for the questionable material. If the average percent Gmm is less than 90.0, <br /> address the segregated area in accordance with 334-5.10.4. <br /> 334-5.10.2 Cross Slope: Construct a pavement surface with cross slopes in <br /> compliance with the requirements of the Contract Documents. <br /> 334-5.10.3 Pavement Smoothness: Construct a smooth pavement meeting <br /> the requirements of this Specification. Furnish a 15 foot manual and a 15 foot rolling <br /> straightedge meeting the requirements of FDOT Test Method FM 5-509. <br /> 334-5.10.3.1 Straightedge Testing: <br /> 334-5.10.3.1.1 Acceptance Testing: Perform straightedge testing <br /> in the outside wheel path of each lane for the final (top) layer of the pavement. Test all <br /> pavement lanes where the width is constant using a rolling straightedge and document all <br /> deficiencies on a form approved by the Engineer. Notify the Engineer of the location and time <br /> of all straightedge testing a minimum of 48 hours before beginning testing. i <br /> I <br /> 334-5.10.3.1.2 Final(Top)Pavement Layer:At the completion of <br /> all paving operations, straightedge the final (top) layer either behind the final roller of the <br /> paving train or as a separate operation. Address all deficiencies in excess of 3/16 inch in <br /> accordance with 334-5.10.4, unless waived by the Engineer. Retest all corrected areas. <br /> 334-5.10.3.1.3 Straightedge Exceptions:Straightedge testing will <br /> not be required in the following areas: shoulders, intersections,tapers, crossovers, sidewalks, i <br /> shared use paths, parking lots and similar areas, or in the following areas when they are less <br /> than 250 feet in length:turn lanes, acceleration/deceleration lanes and side streets. The limits <br /> 01025-42 Technical Specifications <br /> RNPublic Works\ENGINEERING DIVISION PROJECTS\1123 43rd Ave Sidewalk Improvements 26th St.to Airport Dr West\Admim\bid <br /> d ocu ments\M aster Contract Documents\Technical Specifications.doc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.