My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Board of County Commissioners <br /> qy 18012`71h Street <br /> Vero Beach, Florida 32960-3365 <br /> COBIpt' Telephone: (772) 567-8000 <br /> Fax: (772) 778-9391 <br /> PRE-BID MEETING MINUTES <br /> NOVEMBER 9,2016, 10:00 A.M. <br /> INDIAN RIVER COUNTY ADMINISTRATION BUILDING <br /> Room Al-303 Building A <br /> Project Name: 43RD AVENUE SIDEWALK IMPROVEMENTS FROM <br /> AVIATION BOULEVARD TO AIRPORT DRIVE WEST <br /> Project Number: IRC 1123 <br /> Bid Number: 2017013 <br /> FM No.431725-2-58-01 <br /> INTRODUCTIONS/SIGN IN SHEET <br /> This is a PRE-BID MEETING;Attendance at this conference by all bidders is MANDATORY. <br /> Bidders must sign in before 10:00am to receive credit for attending. <br /> See attached Sign-in sheet for attendees. <br /> PROJECT DESCRIPTION: <br /> The project consists of the construction of an 8-foot-wide concrete sidewalk along the east side of 43rd <br /> Avenue from Aviation Boulevard to Airport Drive West. The sidewalk improvements will be approximately <br /> 0.69 miles in length. The work will also include minor shoulder work, ditch grading, drainage piping with <br /> drainage structures,signing and pavement markings. <br /> This project is Federally funded grant through the Florida Department of Transportation Local Agency <br /> Program (LAP). <br /> CONTRACT DETAILS <br /> Bid opening:Wednesday, November 23,2016 at 2:00 PM (Has been revised to December 7,2016) <br /> Contract time: 120 days to substantial completion <br /> 150 days to final completion <br /> Estimate: $548,716.90 <br /> Liquidated Damages:$1,584.00 per day <br /> CONTACTS BIDDING PROCESS <br /> All communications concerning this bid shall be directed to Indian River County Purchasing Division at <br /> purchasing(@ircgov.com <br /> PROJECT CONSULTANTS: <br /> In-house design, Indian River County Engineering Division <br /> P:%Public Warks\ENGINEERTNO DIVISION PROJECTS\1 123 43rd Ave Sidewalk Improvements 26th St.to lkirporl Dr <br /> West\Admim\Nfeetings\Pre-Bid\Pre-bid Meeting Minutes 11-9-16.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.