My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-005B
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-005B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 11:18:39 AM
Creation date
2/17/2017 11:18:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2017
Control Number
2017-005B
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract and Specifications
43rd Ave, Sidewalk Improvements
Area
Aviation Blvd. to Airport Drive West
Project Number
1123
Bid Number
2017013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISCUSSION <br /> • There will be a change in project management at the end of the month as Michael Nixon will be <br /> retiring. The new project manager will be either James Ennis or another engineer. <br /> • The Maintenance of Traffic Plan shall be submitted prior to the Pre-Construction Meeting so that it <br /> can be approved and the Notice to Proceed can be issued immediately after. <br /> The sidewalk slope shall not exceed 2%. F.D.O.T. will require any sidewalk exceeding this to be <br /> removed and replaced to meet ADA requirements. <br /> • Curb ramps shall be in compliance with the F.D.O.T. Index 304 and only embedded Detectable <br /> Warnings shall be used. <br /> • Pavement markings will be part of this project as shown on the plans. An addendum will be sent out <br /> that pertains to some changes in the curb ramps at the intersection of 43rd Avenue and Aviation <br /> Boulevard and that may affect the intersection and also may delay the bid opening. <br /> • A construction schedule shall be submitted prior to the Notice to Proceed or as a condition to the <br /> Notice to Proceed prior to any work commencing. A bar type chart is acceptable. <br /> • Shop drawings should be submitted as soon as possible to the County for approval so thatthere are <br /> no delays in the commencement of work. <br /> • Silt fence and other pollution prevention measures shall be implemented as needed to comply with <br /> all necessary requirements as specified in the plans and contract. All questions shall be directed to <br /> the Purchasing Division purchasing@ircgov.com up until the deadline for the questions. <br /> • After the bid is awarded, questions about compliance can be directed to the County Senior <br /> Stormwater Inspector and Enforcement Coordinator, Todd Tardif at 772-473-0666 or <br /> ttardif(@ircgov.com. <br /> • Sheet 11 of the Construction Drawings have been revised to clarify direction to restore the roadway <br /> radius return for Airport Drive West. <br /> ATrACHED:Sign in Sheet <br /> F-Tublir Works"ENGINEERING DIVISION PROJECTSU123 43rd Ave Sidewatk Improvements;26th St.to Airport Dr <br /> Wes Mdni im\,tyj ecti ngs\Pre-B id\Pre-bid meeting Minutes II-9-16.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.