My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/2016 (3)
CBCC
>
Meetings
>
2010's
>
2016
>
12/13/2016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 2:06:57 PM
Creation date
2/21/2017 1:30:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/13/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />No. 11 <br />DATE OF ISSUANCE.: 10/26/16 EFFECTIVE QATE: 10/26/16 <br />OWNER: Indian River County <br />CONTRACTOR: Sunshine Land Design, Inc. <br />Project: Gifford Neighborhood 451h Street Beautification Project <br />OWNER's Project No. 1506 <br />OWNER'S Bid No. 2015040 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Restoration of landscaping damaged as a result of Hurricane Matthew. <br />Purpose of Work Change Directive: <br />Compensation for additional costs related to repairs to landscaping damaged by Hurricane <br />Matthew. <br />Attachments: (List documents supporting' change) <br />' Sunshine Land Design Proposal dated 10/14/16, see attached. <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in Method of determining change in <br />Contract Prices Contract Times <br />❑ Unit Prices ❑ Contractor's Records <br />J$( Lump Sum Engineer's Records <br />>Q Other: II Other. <br />0 By Change Order. Q By Change Order <br />Estimated Increase of this Work Change Directive Estimated increase in Contract Times: <br />$§21M Substantial Completion: IQ days; <br />Ready for Final Completion: 10 days. <br />If the change involves an Increase, the estimated If the change involves an increase, the estimated <br />.amount is not to be exceeded without further time Is not to be exceeded without further <br />authorization. authorization. <br />ACC TED: <br />RECOMMENDED: <br />APPROVED: <br />James W. Ennis, P <br />By: <br />By: <br />By:k"I <br />CONTRAC R (Sig tura) <br />EN EER (Signature) <br />OWNER (Signature) <br />Date: /0 L7 01 <br />Date: <br />Date: 111111,6 <br />FAIDublic WadmWNGINEERING DIVISION PROJECTS11608-Gifford Neighborhood.45th St BeautiFlcatlonlAdminlWorkChange <br />Dkedives\WCD-11_Hunicane MatthewURC-1606 WCD41_Hurdeane Matthew.doc <br />P61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.