My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/2016 (3)
CBCC
>
Meetings
>
2010's
>
2016
>
12/13/2016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 2:06:57 PM
Creation date
2/21/2017 1:30:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/13/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WDEIGN <br />TLMAND <br />PER PURCHASE ORDER TOTAL: $ 5,765.67 <br />iQUALIFICATIONS: <br />THIS PROPOSAL MAYBE SUBJECT TO CHANGE IF NOT ACCEPTED WITHIN THIRTY DAYS. <br />PAYMENTS NOT MADE PER THE ABOVE, SHALL BE SUBJECT TO ALL TERMS OFTHE FLORIDA LIEN LAW. THIS INCLUDES ADDn10NAL INTERESTAND <br />REASONABLE LEGAL FEES. <br />ACCEPTANCE SIGNATURE DATE: <br />SUNSHINE LAND DESIGN INC: ✓orlimod °i �� 1 President DATE: Date: 10/14/2016 <br />CGC13188851CUC1223792 Gifford Storm Damage 10/14/2016 <br />P62 <br />PROPOSAL <br />COMPLETE PROPERTY MArmr-TANCIt? <br />RESTORATION & CONS MLICTION SERVICES <br />3291 SE Lionel Terrace, Stuart FL 34994 <br />{ <br />Phone; 772 283 2648 / Fax: 772 283 8944 <br />T0: Ridta"'SZpyrKaeLandDesign.com <br />PROPOSAL DATE: <br />10/14/2016 <br />Indian River County <br />180127th Street <br />SUBMITTED BY: <br />Tim Taylor <br />Vero Beach, FL 32960 <br />Tlavior9bsunshinelanddesion.com <br />Mobile: (772) 226-1221 <br />E-mail': rszpyrka@ircgov.com <br />ENGINEER: Not Applicable <br />PLAN DATE: 3/15/2015 <br />105 DESCRIPTION: <br />45th Street Gifford <br />Replant And Stake trees Blown By <br />Storm Mathew <br />300 AS OUTLINED BELOW <br />Qom( UN IfS ITEMS <br />ITEM COST <br />Provide a crew and Materials to replant and stake trees blown over by storm Mathew - <br />1 Crew Supervisor with Truk <br />2 Day $ 480.00 <br />$ <br />960.00 <br />2 Provide loader/ tare boom <br />1 Day $ 780.00 <br />$ <br />780.00 <br />3 Water Truck / 2 men ( Includes supplemental water) <br />2 Day $ 750.00 <br />$ <br />1,500.00 <br />4 Landscape crew <br />2 Day $ 1,200.00 <br />$ <br />2,400.00 <br />5 Material Costs (2x4. hardware, etc.) <br />1 LS $ 125.67 <br />$ <br />125.67 <br />PER PURCHASE ORDER TOTAL: $ 5,765.67 <br />iQUALIFICATIONS: <br />THIS PROPOSAL MAYBE SUBJECT TO CHANGE IF NOT ACCEPTED WITHIN THIRTY DAYS. <br />PAYMENTS NOT MADE PER THE ABOVE, SHALL BE SUBJECT TO ALL TERMS OFTHE FLORIDA LIEN LAW. THIS INCLUDES ADDn10NAL INTERESTAND <br />REASONABLE LEGAL FEES. <br />ACCEPTANCE SIGNATURE DATE: <br />SUNSHINE LAND DESIGN INC: ✓orlimod °i �� 1 President DATE: Date: 10/14/2016 <br />CGC13188851CUC1223792 Gifford Storm Damage 10/14/2016 <br />P62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.