My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/10/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
01/10/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2017 3:48:32 PM
Creation date
2/21/2017 1:38:05 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/10/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
setbacks from existing utilities and facilities; and review the sites and adjacent areas <br />for items which may affect permitting of a new well site. <br />Consultant will prepare design drawings for a new wellhead, similar in design and <br />configuration to the existing wellhead. It is assumed that the pump will be vertical <br />turbine type using flanged or threaded column pipe. The design documents will <br />consist of civil, mechanical, and electrical drawings that will include connection to <br />the existing 12 -inch raw watermain, use of the existing electrical service, and a new <br />fiber optic connection to allow direct communication of well with the water plant. <br />it is assumed the radio telemetry will be eliminated as part of this replacement. <br />It is assumed that approximately 10 -12 drawings will be prepared, consisting of; <br />• Cover sheet <br />• Overall site plan <br />• Civil details <br />• Wellsite plan & details <br />• Wellhead sections <br />• Mechanical details <br />• Electrical (single line, panel drawings, fiber optic) <br />The consultant will prepare technical specifications for construction and drilling of <br />a new supply well. <br />Consultant will prepare a 90% set of drawings and specifications for IRCU to <br />review, and incorporate comments into the final set of drawings and specifications <br />to be used for a change order request from the current contractor, and submission <br />to FDEP for permitting. <br />Consultant will design modifications to the existing radio telemetry unit (RTU) at <br />well S-4 to include fiber optic connectivity using Ethernet communication. Remote <br />PLC's will be designed at the well to allow communication via Ethernet over FO. <br />Consultant will design well panel PLC hardware at the well #S-4 and interface with <br />existing system. <br />TASK 2 - PERMITTING <br />Consultant will evaluate the need for permitting a replacement well, including <br />preparation of a letter modification to SJRWMD Permit and an updated location map <br />and Table A (description of wells). No changes to existing permit allocation shall be <br />requested in the letter modification. <br />K:\WPB_Civil\044572029 - Well 7 Construction\Scope\IRCU Floridan Well S-4 Replacement WO rev3 docx Page 2 of 6 <br />P95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.