The Consultant will prepare and submit an FDEP permit application 62-555.900(1) for <br />the proposed surficial wellhead, and raw watermain improvements for the new well, <br />including a permit application fee paid for by IRCU. The Consultant will submit one <br />permit application for the wellhead work and the raw watermain connection to the <br />existing. The permit application will be submitted when the drawings and <br />specifications are in a condition for permitting agency review. Consultant will <br />respond to up to two requests for additional information (RFI's from DEP). <br />The permit application fee of $2,000 for FDEP will be paid for by Indian River County <br />Utilities (IRCU). <br />The permit application fee for the SFWMD construction permit will be paid by water <br />well contractor. <br />TASK 3 — COORDINATION OF CHANGE ORDER <br />Consultant will assemble design documents and coordinate with contractor <br />preparation of a change order to construct the replacement well S-4. <br />Consultant will provide up to four (4) copies of drawings and technical <br />specifications for use by Indian River County (IRC) and contractor. <br />Consultant will respond to contractor questions, and provide written responses for <br />IRC to process for the work prepared by KHA. <br />Consult will review change order proposal from contractor and provide review <br />summary and recommendation to IRCU. Detailed negotiation with contractor is <br />not included. <br />TASK 4 — CONSTRUCTION PHASE SERVICES - FLORIDAN AQUIFER WELL & <br />WELLHEAD #S-4 <br />Consultant will provide construction phase services for the drilling of well #S-4, <br />wellhead installation, and startup and operational testing of the well. Final FDEP <br />certification of Well #S-4 and raw watermain will be provided. <br />The Consultant's site visits will be for the purpose of endeavoring to provide the <br />Owner a greater degree of confidence that the completed work of its contractors <br />will generally conform to the construction documents. The Consultant neither <br />guarantees the performance of contractors, nor assumes responsibility for any <br />contractor's failure to perform its work in accordance with the contract documents. <br />Work that the Consultant believes does not comply with the contract documents <br />will be brought to the attention of Indian River County Utilities and the contractor. <br />K:\WPB_Civil\044572029 - Well 7 Construction\Scope\IRCU Floridan Well S-4 Replacement WO rev3.docx Page 3 of 6 <br />P96 <br />