My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/10/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
01/10/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2017 3:48:32 PM
Creation date
2/21/2017 1:38:05 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/10/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Consultant shall have no responsibility for any contractor's means, methods, <br />techniques, equipment choice and usage, sequence, schedule, safety programs, or <br />safety practices, nor shall the Consultant have any authority or responsibility to <br />stop or direct the work of any contractor. <br />Consultant will provide construction phase services including hydrogeological <br />services, performance testing of each well, and preparation of a well completion <br />report for well #S-4 Floridan Aquifer well. Consultant will utilize subconsultant <br />services of JLA Geosciences, Inc. for the Hydrogeologic Consulting Services (JLA). <br />Consultant will provide hydrogeological support and observation services during <br />Upper Floridan Aquifer well #S-4 construction including surface casing installation, <br />pilot hole drilling, geophysical logging, casing installation, grouting casing in place <br />for each lift of cement, completion interval drilling and associated testing, <br />preliminary well development, acid treatment, pump development and testing. <br />Consultant will also provide well performance testing, including water level <br />measurements, specific capacity analysis, and basic water quality testing <br />(conductivity, chlorides, silt density indices—SDI's and sand testing). Consultant <br />will provide up to 220 hours of on-site hydrogeological services (JLA) for well #S-4. <br />Consultant will review drilling, geologic and geophysical data and provide <br />recommendations for casing setting depths and completion intervals. Consultant <br />will review completion interval drilling and testing data and recommend if acid <br />treatment is necessary, review acid treatment and testing plans. Consultant will <br />review pump test results and provide recommendations for permanent pump <br />setting depth and recommended in service pumping rate. <br />Consultant will coordinate water quality testing, which includes clearance water <br />quality in accordance with FDEP regulations and additional water quality for <br />membrane projections. <br />Consultant will provide contract document interpretation, shop drawing and pay <br />request review and change order requests. These construction phase services <br />assume the well location, and formation water disposal determined above will not <br />change during construction. Shop drawing submittal will be reviewed for <br />conformance with the intent of the contract documents. Shop drawing will be <br />submitted directly to the Consultant. The Consultant will review the submittal and <br />return copies to the contractor and Indian River County Utilities. <br />KHA will prepare a well completion report for well #S-4, including a summary of <br />the lithologic logs, field logs, hydrologic and water quality data, and preparation of <br />figures, data, lithogic logs, and appropriate attachments. <br />K:\WPB_Civi1\044572029 - Well 7 Construction\Scope\IRCU Floridan Well S-4 Replacement WO rev3.docx Page 4 of 6 <br />P97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.