The well completion report and data will be used for future well clearance when the <br />wells are placed into service. Up to six (6) final copies of the report will be <br />furnished to Owner. <br />It is anticipated that the additional construction phase for the addition of well S-4 <br />will extend the original schedule by three (3) months. <br />The installation of the well pump, column piping, and electrical service for <br />operation of the well #S-4 is assumed to be included under the drilling and <br />rehabilitation phase. Consultant will attend additional progress meetings, up to <br />two (2) additional onsite progress meetings to discuss progress, review construction <br />related issues, and provide coordination where needed. <br />Consultant will prepare and submit a FDEP certification of construction completion <br />and request for clearance to place well #S-4 into operation (FDEP Form 62- <br />555.900(9)). Record drawing information will be provided by the contractors and <br />included with the certification package. <br />SCHEDULE <br />In general, the following schedule is anticipated and run concurrently with the <br />current work order schedule and contractor schedule. <br />Task 1 Prepare Design Docs <br />Task 2 Permitting <br />Task 3 Coordination <br />Task 4 Construction Phase <br />2 - 3 weeks from Notice to Proceed (NTP) <br />4 - 6 weeks after Task 1 <br />2 week after documents prepared <br />6 - 8 months after Notice of Award to <br />Contractor <br />FEE SCHEDULE <br />We will provide these services in accordance with our Continuing Services Contract <br />Agreement for Professional Services dated November 15, 2011, with Indian River <br />County. <br />The Consultant will provide professional services for Task 1 through Task 4 on a <br />lump sum fee basis as follows: <br />K:\WPB_Civil\044572029 - Well 7 Construction\Scope\IRCU Floridan Well S-4 Replacement WO rev3.docx Page 5 of 6 <br />P98 <br />