My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/10/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
01/10/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2017 3:48:32 PM
Creation date
2/21/2017 1:38:05 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/10/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CDMA <br />ith <br />Mr. Himanshu H. Mehta, P.E. <br />Managing Director <br />December 28, 2016 <br />Page 2 <br />TASK 2.0 - FINANCIAL ASSURANCE <br />SWDD operates a Class I landfill and a Construction and Demolition (C&D) debris landfill facility <br />through a contract with Republic Services Inc. SWDD is required by Chapter 62-701, F.A.C. to <br />provide financial assurance for each of these facilities annually. <br />Task 2.1- Financial Assurance Report <br />CDM Smith prepared documentation that demonstrated proof of financial assurance for the cost of <br />closing and providing long-term care for the Class I landfill, the C&D debris landfill, and the waste <br />tire processing center. CDM Smith submitted the final Financial Assurance Report, which included <br />recommendations for Fiscal Year 2015-2016 escrow account balances to SWDD on December 16, <br />2016. <br />Task 2.2 - Survey and Airspace Assessment <br />Under this task, CDM Smith provided a survey and assessment of consumed airspace. The survey <br />work was performed by Masteller, Moler, Reed & Taylor, Inc. for the Class I and construction & <br />demolition (C&D) debris Landfills. The survey work for the Class I landfill included a complete <br />topographic survey of the "Infill', the entire Segment I cell, as well as the ditches and roadways <br />surrounding the Class I area. The topographic survey of the C&D debris landfill site was included in <br />the waste area, as well as the fence -line and the surrounding ditches and berms adjacent to the C&D <br />debris landfill site. <br />The survey was transmitted to SWDD on June 7, 2106. The deliverable from Masteller, Moler, Reed <br />& Taylor, Inc. consisted of a survey report identifying the date the field survey was completed and <br />the airspace consumed for the Segments II and III portions of the Class I landfill, as well as the C&D <br />debris landfill. The deliverable included the topographic survey, aerial photograph, and a compact <br />disk containing the AutoCAD files. <br />CDM Smith appreciates the opportunity to provide these services to IRC SWDD. If you have any <br />questions or require additional information on the above project, please contact me. <br />Sincerely, <br />Kevin N. Vann, P.E., BCEE <br />Principal Environmental Engineer <br />CDM Smith Inc. <br />KNV/jj <br />File: PW_PL1_6706-112992.02.01 <br />01953.doa 0 <br />P227 <br />
The URL can be used to link to this page
Your browser does not support the video tag.