My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-027E
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-027E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 11:00:38 AM
Creation date
3/21/2017 2:02:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/21/2017
Control Number
2017-027E
Agenda Item Number
8.K.
Entity Name
Proctor Construction LLC
Subject
Indian River County Shooting Range
Contract & Specifications
Hunter Education Classroom
Area
IRC Shooting Range
Project Number
1213C
Bid Number
2017008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> concept of the completed Project as a functioning 4. When "furnish," "install," "perform," or <br /> whole as shown or indicated in the Contract "provide" is not used in connection with services, <br /> Documents (unless there is a specific statement materials, or equipment in a context clearly <br /> indicating otherwise). The use of any such term or requiring an obligation of CONTRACTOR, <br /> adjective shall not be effective to assign to ENGI- "provide"is implied. <br /> NEER any duty or authority to supervise or direct <br /> the performance of the Work or any duty or E. Unless stated otherwise in the Contract Docu- <br /> authority to undertake responsibility contrary to the ments, words or phrases which have a well-known <br /> provisions of paragraph 9.10 or any other provision technical or construction industry or trade meaning are <br /> of the Contract Documents. used in the Contract Documents in accordance with <br /> such recognized meaning. <br /> B. Day <br /> 1. The word "day" shall constitute a ARTICLE 2- PRELIMINARY MATTERS <br /> calendar day of 24 hours measured from <br /> midnight to the next midnight. <br /> 2.01 Delivery of Bonds <br /> C. Defective <br /> A. When CONTRACTOR delivers the executed <br /> 1. The word"defective,"when modifying Agreements to OWNER, CONTRACTOR shall also <br /> the word "Work," refers to Work that is deliver to OWNER such Bonds as CONTRACTOR <br /> unsatisfactory, faulty, or deficient in that it does may be required to furnish. <br /> not conform to the Contract Documents or does <br /> not meet the requirements of any inspection, 2.02 Copies of Documents <br /> reference standard, test, or approval referred to <br /> in the Contract Documents, or has been A. OWNER shall furnish to CONTRACTOR up <br /> damaged prior to ENGINEER's recom- to ten copies of the Contract Documents. Additional <br /> - - - mendation-of final payment--(unless-responsi- - - --copies-will-be-furnished-upon-request-at--the cost of- --- -- -- <br /> bility for the protection thereof has been reproduction. <br /> assumed by OWNER at Substantial <br /> Completion in accordance with paragraph 2.03 Commencement of Contract Times,Notice <br /> 14.04 or 14.05). to Proceed <br /> D. Furnish, Install, Perform, Provide A. The Contract Times will commence to run on <br /> the thirtieth day after the Effective Date of the Agree- <br /> 1. The word "f�,,,;;sh�h,," when used ;rt ment or, if a Notice to Proceed is given, on the day <br /> connection—with seFVlGes, materials, or indicated in the Notice to Proceed. A Notice to Pro- <br /> egeipment she" F•^^^ to supply an ceed may be given at any time within 30 days after the <br /> said sewi^ee materials, equipment to the Effective Date of the Agreement. In no event will the <br /> Site nor s^me^cher spe^ifi Gaready r Contract Times commence to run later than the <br /> • ^stallatien-and-ia usable-or operable ninetieth day after the day of Bid opening or the <br /> Gond GIF6 thirtieth day after the Effective Date of the Agreement, <br /> whichever date is earlier. <br /> _. The word "install,"when used-h <br /> Gerrrrestian with senfic-es, materials, e 2.04 Starting the Work <br /> it, shall rnean to put into use or place <br /> id sew;Ges, materials, or A. CONTRACTOR shall start to perform the <br /> equipment complete and read•, '^r intended Work on the date when the Contract Times com- <br /> mence to run. No Work shall be done at the Site prior <br /> to the date on which the Contract Times commence to <br /> 3. The word"peFfORR—or "—fie," run. <br /> when used iR 130nneGfien with fiG@�r <br /> materials OF equipment, shall mean to farni2.05 Before Starting Construction <br /> and install said seNiGes, materiais, or <br /> ppLyjlSit mplete and ready far intended A. CONTRACTOR's Review of Contract <br /> Docu-ments., Before undertaking each part of the Work, <br /> CONTRACTOR shall carefully study and compare the <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-8 <br /> FAPublic WorkslENGINEERING DIVISION PROJECTSM13C IRC Shooting Range Hunter Eduction ClassroomlAdmin\bid documentslMaster Contract Documents100700-General <br /> Conditions REV 5-10-13.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.