My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-027E
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-027E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 11:00:38 AM
Creation date
3/21/2017 2:02:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/21/2017
Control Number
2017-027E
Agenda Item Number
8.K.
Entity Name
Proctor Construction LLC
Subject
Indian River County Shooting Range
Contract & Specifications
Hunter Education Classroom
Area
IRC Shooting Range
Project Number
1213C
Bid Number
2017008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Documents and check and verify pertinent working understanding—amonn the paFUes as to the <br /> figures therein and all applicable field measurements. Worknrd+e dice,,SS+hec nherh,IaQles referred to in pore <br /> CONTRACTOR shall promptly report in writing to graph PrO <br /> ENGINEER any conflict, error, ambiguity, or and other submittals, pfeGessing-Application <br /> discrepancy which CONTRACTOR may discover and Payment, and maintaining required reeerds <br /> shall obtain a written interpretation or clarification from <br /> ENGINEER before proceeding with any Work affected 2.07 Initial Acceptance of Schedules <br /> thereby; however, CONTRACTOR shall not be liable <br /> to OWNER or ENGINEER for failure to report any A. Unless otherwise provided in the Contract <br /> conflict, error, ambiguity, or discrepancy in the Documents, at least ten days before submission of the <br /> Contract Documents unless CONTRACTOR knew or first Application for Payment a conference attended by <br /> reasonably should have known thereof. CONTRACTOR, ENGINEER, and others as appropri- <br /> ate will be held to review for acceptability to ENGI- <br /> B. Preliminary Schedules: Within ten days after NEER as provided below the schedules submitted in <br /> the Effective Date of the Agreement(unless otherwise accordance with paragraph 2.05.13. CONTRACTOR <br /> specified in the General Requirements), CONTRAC- shall have an additional ten days to make corrections <br /> TOR shall submit to ENGINEER for its timely review: and adjustments and to complete and resubmit the <br /> schedules. No progress payment shall be made to <br /> 1. a preliminary progress schedule CONTRACTOR until acceptable schedules are <br /> indicating the times (numbers of days or dates) submitted to ENGINEER. <br /> for starting and completing the various stages <br /> of the Work, including any Milestones specified 1. The progress schedule will be <br /> in the Contract Documents; acceptable to ENGINEER if it provides an <br /> orderly progression of the Work to completion <br /> 2. a preliminary schedule of Shop within any specified Milestones and the <br /> Drawing and Sample submittals which will list Contract Times. Such acceptance will not <br /> each required submittal and the times for sub- impose on ENGINEER responsibility for the <br /> _- _- ----mitting,—reviewing, - and---processing-- such-- --progress-------progress schedule,, for sequencing,-scheduling;------ <br /> submittal;and or progress of the Work nor interfere with or <br /> relieve CONTRACTOR from CONTRACTOR's <br /> 3. a preliminary schedule of values for full responsibility therefor. <br /> all of the Work which includes quantities and <br /> prices of items which when added together 2. CONTRACTOR's schedule of Shop <br /> equal the Contract Price and subdivides the Drawing and Sample submittals will be <br /> Work into component parts in sufficient detail to acceptable to ENGINEER if it provides a <br /> serve as the basis for progress payments workable arrangement for reviewing and <br /> during performance of the Work. Such prices processing the required submittals. <br /> will include an appropriate amount of overhead <br /> and profit applicable to each item of Work. 3. CONTRACTOR's schedule of values <br /> will be acceptable to ENGINEER as to form <br /> S. €videnGe of lnsura„seBefere any Work at and substance if it provides a reasonable <br /> the Site is + rt rd GONTRAGTOR and !lWNE'l7 shall allocation of the Contract Price to component <br /> each deliver-to the ether, with espies to each parts of the Work. <br /> additional insuFed identified in the Supplementa <br /> tes of insur;Rse—(ar,a—sthef ARTICLE 3-CONTRACT DOCUMENTS: INTENT, <br /> eviden cf�either of +,- theFn-orn AMENDING, REUSE <br /> CONTRACTOR a d—OWNER respestioely--are <br /> requiFed to puFGhase and maintain in GGardaMe with 3.01 Intent <br /> Ar tiGle- <br /> A. The Contract Documents are comple- <br /> 2.06 Preconstruction Conference mentary; what is called for by one is as binding as if <br /> called for by all. <br /> A.-Within <br /> to run but before any Work at the cite is staFterl B. It is the intent of the Contract Documents to <br /> conferenGe attended by CONTRACTOR, ENGINEER, describe a functionally complete Project(or part there- <br /> and •ate-viill be held to eof) to be constructed in accordance with the Contract <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-9 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1213C IRC Shooting Range Hunter Eduction ClassroomWdmin\bid documents\Master Contract Documents\00700-General <br /> Conditions REV 5-10-13.doc <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.