My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-027E
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-027E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 11:00:38 AM
Creation date
3/21/2017 2:02:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/21/2017
Control Number
2017-027E
Agenda Item Number
8.K.
Entity Name
Proctor Construction LLC
Subject
Indian River County Shooting Range
Contract & Specifications
Hunter Education Classroom
Area
IRC Shooting Range
Project Number
1213C
Bid Number
2017008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> SC-14.02 Progress Payments <br /> SC-14.02.B.5. Delete paragraph GC-14.02.B.5.d in its entirety and insert the following paragraph <br /> in its place: <br /> d. ENGINEER has actual knowledge of the occurrence of any of the events <br /> enumerated in paragraph 15.02.A; or <br /> SC-14.02.13.5. Add the following sentences at the end of paragraph GC-14.02.B.5. <br /> e. OWNER has been required to pay ENGINEER additional compensation because <br /> of CONTRACTOR delays or rejection of defective Work; or <br /> i <br /> f. OWNER has been required to pay an independent testing laboratory for <br /> subsequent inspections, tests, or approvals taken after initial failing inspections, I <br /> tests, or approvals. <br /> SC-14.02.C.1. Delete paragraph GC-14.02.C.1 in its entirety and insert the following <br /> paragraph in its place: <br /> C. Payment Becomes Due i <br /> 1. Payment shall be made by OWNER to CONTRACTOR according to the Local <br /> Government Prompt Payment Act. F.S. 218.70 et. seq. <br /> SC-14.04 Substantial Completion <br /> SC-14.04A. After the third sentence in paragraph GC-14.04A of the General Conditions, <br /> delete the remainder of paragraph 14.04A in its entirety and replace with the following: <br /> "If Engineer considers the Work substantially complete, Engineer will, prepare <br /> and deliver to Owner a tentative certificate of Substantial Completion that shall fix <br /> the date of Substantial Completion. In accordance with the provisions of Florida <br /> Statutes section 208.735(7)(a)(2005), upon receipt of the tentative certificate of <br /> Substantial Completion from Engineer, the Owner, the Engineer, and the <br /> Contractor shall conduct a walk-through inspection of the Project to document a <br /> list of any items required to render the Work on the Project complete, <br /> satisfactory, and acceptable under this Agreement (herein the "Statutory List"). <br /> The Statutory List shall be reduced to writing and circulated among the Owner, <br /> the Engineer, and the Contractor by the Owner or the Engineer within 30 <br /> calendar days after substantial completion. The Owner and Contractor <br /> acknowledge and agree that: 1) the failure to include any corrective work, or I <br /> pending items that are not yet completed, on the Statutory List does not alter the j <br /> responsibility of the Contractor to complete all of the Work under this Agreement; 1 <br /> 2) upon completion of all items on the Statutory List, the Contractor may submit a <br /> pay request for all remaining retainage except as otherwise set forth in this <br /> Agreement; and 3) any and all items that require correction under this Agreement <br /> and that are identified after the preparation of the Statutory List remain the <br /> obligation of the Contractor to complete to the Owner's satisfaction under this <br /> Agreement. After receipt of the Statutory List by the Contractor, the Contractor <br /> acknowledges and agrees that it will diligently proceed to complete all items on <br /> the Statutory List and schedule a final walk-through in anticipation of final <br /> completion on the Project." <br /> i <br /> I <br /> 00800-9 <br /> 00800-Supplementary Conditions 05-13 rev <br /> 00800 91"Tublic WorkstENGINEERING DIVISION PROJECTSt1213C IRC Shooting Range Hunter Eduction Classroom\Ndmin\bid documents\Master Contract <br /> Documents\00800-Supplementary Conditions 05-13 rev.doc <br />