My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-027E
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-027E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2017 11:00:38 AM
Creation date
3/21/2017 2:02:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/21/2017
Control Number
2017-027E
Agenda Item Number
8.K.
Entity Name
Proctor Construction LLC
Subject
Indian River County Shooting Range
Contract & Specifications
Hunter Education Classroom
Area
IRC Shooting Range
Project Number
1213C
Bid Number
2017008
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
375
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> SC-14.048 Add the following new paragraph immediately after paragraph GC 14.048: <br /> C. At the time of delivery of the tentative certificate of Substantial Completion, Engineer will <br /> deliver to Owner and Contractor a written recommendation as to division of responsibilities <br /> pending final payment between Owner and Contractor with respect to security, operation, <br /> safety, and protection of the Work, maintenance, heat, utilities, insurance, and warranties and <br /> guarantees <br /> SC-14.07 Final Payment <br /> SC-14.07.C.1. Delete paragraph GC-14.07.C.1 in its entirety and insert the following <br /> paragraph in its place: <br /> C. Payment Becomes Due <br /> 1. Payment shall be made by OWNER to CONTRACTOR according to the" Local <br /> Government Prompt Payment Act" , Florida Statutes section 218.70, et. seq. <br /> SC-15.01 OWNER May Suspend Work <br /> SC-15.01.A Delete the last sentence in paragraph GC-15.01.A and insert the following in its <br /> place: <br /> CONTRACTOR shall be allowed an extension of the Contract Times, directly attributable to any <br /> such suspension if CONTRACTOR makes a Claim for an extension as provided in paragraph <br /> 10.05. CONTRACTOR shall not be allowed an adjustment of the Contract Price and <br /> CONTRACTOR shall-not-be paid-on account of_loss of anticipated profits-or revenue_.or-other eco— <br /> nomic loss arising out of or resulting from such Work suspension. <br /> SC-15.02 OWNER May Terminate For Cause <br /> SC-15.02.A.5 and SC-15.02.A.6 Add the following new paragraphs immediately after <br /> paragraph GC-15.02.A.4: <br /> 5. CONTRACTOR's violation of Section 02225—"Erosion Control and Treatment of <br /> Dewatering Water From the Construction Site." <br /> 6. CONTRACTOR's failure to make payment to Subcontractors or Suppliers for <br /> materials or labor in accordance with the respective agreements between the <br /> CONTRACTOR and the Subcontractors or Suppliers. <br /> SC-15.04 CONTRACTOR May Stop Work or Terminate <br /> SC-15.04 Delete the following text from the first sentence of paragraph GC-15.04.A: <br /> er OWNER fails fGF 30 days to pay GONTRAGTOR any sum finally determined to be due, <br /> SC-15.04 Delete the following text from the second sentence of paragraph GC-15.04.A: <br /> eF OWNER has failed f0F 30 days to pay CONTRACTOR any sum finally determined to be <br /> due7 <br /> 00800-10 <br /> 00800-Supplementary Conditions 05-13 rev <br /> 00800 10F\Public WorksIENGINEERING DNISION PROJECTSI1213C IRC Shooting Range Hunter Eduction ClassroomWdminlbid documentsIMaster Contract <br /> Documentsk00800-Supplementary Conditions 05-13 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.